Konica Minolta KIP C7800 User Manual - Page 10

Installation Requirements - weight

Page 10 highlights

1. 1 Installation Requirements The following conditions are required for installation of the equipment. (1) Power source should be as follows (according to your region). U.S.A. / Europe 220 to 240V (+6% to -10%), 20A or higher, and 50/60Hz (2) The equipment must be on an exclusive circuit. The outlet must be near the equipment and easy accessible. (3) Make sure to connect this equipment to a grounded outlet. (4) The site temperature range = 15 to 27 degrees centigrade, with the humidity between 20% to 70% RH (NON CONDENSING). Keep the equipment away from water sources, boilers, humidifiers or refrigerators. (5) The installation site must not have open flames, dust or ammonia gases. (6) The equipment should not be exposed to the direct sunlight. Please draw curtains to block any sunlight. (7) Ozone will be generated while this equipment is in use, although the quantity generated is within safe levels. (see certifications) Ventilate the room, if required. (8) Levelling Bolts on the bottom of the KIP C7800 should touch the floor correctly. And the equipment must be levelled. Floor strength must be ample to sustain the weight of the equipment. (9) Keep ample room around the equipment to ensure comfortable operation. Required space is noted. Rear 120cm (48") or wider 206cm (81") or wider (When optional Auto Stacker is used.) 187cm (74") or wider (When accessory Tray is used) 65cm (26") or wider Front 150cm (59") or wider 1-2 Chapter 1 Before Use

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67

Chapter 1
Before Use
1-2
1. 1
Installation Requirements
The following conditions are required for installation of the equipment.
(1)
Power source should be as follows (according to your region).
U.S.A. / Europe
220 to 240V (+6% to -10%), 20A or higher, and 50/60Hz
(2)
The equipment must be on an exclusive circuit.
The outlet must be near the equipment and easy accessible.
(3)
Make sure to connect this equipment to a grounded outlet.
(4)
The site temperature range = 15 to 27 degrees centigrade, with the humidity between 20% to
70% RH (NON CONDENSING).
Keep the equipment away from water sources, boilers, humidifiers or refrigerators.
(5)
The installation site must not have open flames, dust or ammonia gases.
(6)
The equipment should not be exposed to the direct sunlight.
Please draw curtains to block any sunlight.
(7)
Ozone will be generated while this equipment is in use, although the quantity generated is
within safe levels. (see certifications)
Ventilate the room, if required.
(8)
Levelling Bolts on the bottom of the KIP C7800 should touch the floor correctly.
And the equipment must be levelled.
Floor strength must be ample to sustain the weight of the equipment.
(9)
Keep ample room around the equipment to ensure comfortable operation.
Required space is noted.
120cm (48”)
or wider
150cm (59”) or wider
65cm (26”)
or wider
Rear
Front
206cm (81”) or wider
(When optional Auto Stacker is
used.)
187cm (74”) or wider
(When accessory Tray is used)