LG HMC030KD1 Service Manual - Page 43
Valve
View all LG HMC030KD1 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 43 highlights
3-way Valve 1. Pump down Indoor unit _FLISSt - L1771, Liquid side Open 3-Way valve Outdoor unit Gas side Closed 3-Way valve_ (DO CLOSE CLOSE Purge the air ) A • Procedure (1) Confirm that both liquid side and gas side valves are set to the open position. - Remove the valve stem caps and confirm that the valve stems are in the raised position. - Be sure to use a hexagonal wrench to operate the valve stems. (2) Operate the unit for 10 to 15 minutes. (3) Stop operation and wait for 3 minutes, then connect the charge set to the service port of the Gas side valve. - Connect the charge hose to the service port. (4) Air purging of the charge hose. - Open the low-pressure valve on the charge set slightly to air purge from the charge hose. (5) Set the liquid side valve to the closed position. (6) Operate the air conditioner in cooling mode and stop it when the gauge indicates lkg/cm2g. (7) Immediately set the Gas side valve to the closed position. - Do this quickly so that the gauge ends up indicating 3 to 5kg/cm2g. (8) Disconnect the charge set, and mount the Liquid side and Gas side valve's stem nuts and the service port nut. - Use torque wrench to tighten the service port nut to a torque of 1.8 kg.m. - Be sure to check for gas leakage. - 43 -