LG HMC030KD1 Service Manual - Page 44
refrigerant.
View all LG HMC030KD1 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 44 highlights
1) Re-air purging (Re-installation) Indoor unit C Liquid side Closed 3-Way valve ti Outdoor unit Gas side Closed 3-Way valve oe Gas cylinder _u_ o L R22 OPEN.4D-7h.) \ CLOSE • Procedure (1) Confirm that both the liquid side valve and the gas side valve are set to the closed position. (2) Connect the charge set and a gas cylinder to the service port of the Gas side valve. - Leave the valve on the gas cylinder closed. (3) Air purging. Open the valves on the gas cylinder and the charge set. Purge the air by loosening the flare nut on the liquid side valve approximately 45° for 3 seconds then closing it for 1 minute; repeat 3 times. - After purging the air, use a torque wrench to tighten the flare nut on liquid side valve. (4) Check for gas leakage. - Check the flare connections for gas leakage. (5) Discharge the refrigerant. - Close the valve on the gas cylinder and discharge the refrigerant until the gauge indicates 3 to 5 kg/cm2g. (6) Disconnect the charge set and the gas cylinder, and set the Liquid side and Gas side valves to the open position. - Be sure to use a hexagonal wrench to operate the valve stems. (7) Mount the valve stem nuts and the service port nut. - Use torque wrench to tighten the service port nut to a torque of 1.8 kg.m. - Be sure to check for gas leakage. * CAUTION: Do not leak the gas in the air during Air Purging. - 44 -