LG KG280 Service Manual - Page 113
Test Jig Operation
View all LG KG280 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 113 highlights
11. AUTO CALIBRATION JTAG2 JTAG1 USB MON PHONE UART TA ON OFF ADI-REMOTE POWER TI-REMOTE TA 1234 POWER ON OFF MON Status PS VBAT + UART Status PS _ Figure 11-2 The top view of Test JIG 11.3 Test Jig Operation Power Source Power Supply Table 11-2 Jig Power Description Usually 4.0V Switch Number Switch 1 Switch 2 Switch 3 Switch 4 Name ADI-REMOTE TI-REMOTE VBAT PS Description In ON state, phone is awaked. It is used ADI chipset. In ON state, phone is awaked. It is used TI chipset. Power is provided for phone from battery Power is provided for phone from Power supply Table 11-3 Jig DIP Switch LED Number LED 1 LED 2 LED 3 LED 4 Name Power TA UART MON Description Power is provided for Test Jig Indicate charging state of the phone battery Indicate data transfer state through the UART port Indicate data transfer state through the MON port Table 11-4 LED Description LGE Internal Use Only - 114 - Copyright © 2007 LG Electronics. Inc. All right reserved. Only for training and service purposes