LG KG280 Service Manual - Page 50
TEST POINT, Waveform, Checking Flow, CIRCUIT
![]() |
View all LG KG280 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 50 highlights
4. TROUBLE SHOOTING (3) Checking PAM Control Signal TEST POINT CIRCUIT VAPC 20 VBATT 17 VCC1B 6 VCC1A 2 10V Over ECCH0000155 ECCH0000155 10V Over U600 C606 (PAM_EN) Figure 9 Waveform C650 (TX_RAMP) C605 C651 0.01u 0.01u GND9 16 GND8 14 13 GND7 12 GND6 GND5 15 DCS_PCS_OUT DCS_PCS_IN 3 11 EGSM_OUT 19 U600 RSVD_GND SKY77318 21 P_GND 4 EGSM_IN ENABLE 18 1 BS 10 GND4 9 8 GND3 7 GND2 GND1 5 R607 220 R611 180 R605 24 R612 30 R608 220 C608 33p C611 R613 10p 180 C606 27p R601 R602 C607 NA 100ohm 100ohm PA_EN PA_BAND Checking Flow Check TX_RAMP and PA_EN Check if there is Any Major Difference or not Refer to Graph 6 Graph 6 Similar? Yes No Redownload S/W Go to Next Step Copyright © 2007 LG Electronics. Inc. All right reserved. Only for training and service purposes - 51 - LGE Internal Use Only
![](/manual_guide/products/lg-kg280-service-manual-8d3db4f/50.png)