LiftMaster RSW12V RSW12V Install Manual - Page 13
» Compact Installation Only
View all LiftMaster RSW12V manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 13 highlights
INSTALLATION » COMPACT INSTALLATION ONLY DETERMINE LOCATION FOR CONCRETE PAD AND OPERATOR DO NOT run the operator until instructed. Refer to the illustration to determine the measurements and location of the concrete pad. NOTE: When lifting the operator use the handle to avoid damaging the operator. TOP VIEW OF OPERATOR AND GATE Gate Hinge Center Gate Open 90° 26-1/2" Output Shaft Center 9" 28" 24" CONCRETE PAD AND OPERATOR ATTACHMENT Check the national and local building codes before installation. 1 Install the electrical conduit. 2 Pour a concrete pad (reinforced concrete is recommended). The concrete pad should be 6 inches above the ground and deeper than the frost line. 3 Secure the operator to the concrete pad with appropriate fasteners. NOTE: An alternative to a concrete pad is to post mount the operator (refer to accessories). MOUNTING FOOTPRINT 14" 12.2" 13.6" 6" Above Ground 2 Below the frost line. Check all national and local codes. 1 28" 17" 3 4 Concrete Anchors 1/2" x 3 1/2" 24" 12