LiftMaster SW470 SW490 GL BOARD Manual - Page 11
Pad Mounting (SW490), IMPORTANT NOTE
View all LiftMaster SW470 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
INSTALLATION PAD MOUNTING (SW490) 1. Measure the gate length and select appropriate "P" dimension from the gate installation table. 2. Layout the concrete pad as detailed in Figure 1. IMPORTANT NOTE: The relative location of the operator to the fence and the gate is critical. Be sure that the measurements for operator mounting are taken from the centerline of the fence and of the gate hinge. 3. Locate electrical conduit, as required, prior to pouring concrete. 4. Pour concrete pad. 5. Bolt the (2) pad mount brackets to the bottom of the operator with the hardware provided (Install the operator so that the output shaft is on the side closest to the gate). 6. Secure the operator to the pad. It is very important that the operator be level and square to the gate. Figure 1 P Gate 5" Output Shaft Fence 1/2" Redhead (4 Required) 8" Operator 28" Concrete Pad 18" x 34" min. Figure 2 SW490 GATE OPERATOR INSTALLATION TABLE GATE LENGTH (FEET) 8-9 10-11 12-13 14-15 16-17 18-19 20-21 22 P DIMENSION IN INCHES 21.9 25.3 28.8 32.3 35.7 39.2 42.7 46.1 1/2" red head bolts or anchors (4 required) Using suitable hardware secure operator to L-bolts Power and control wiring should be run in separate conduit Concrete Pad 2" to 4" above grade Depth required by local codes or below frost line 11