Linksys UC540W-BRI-K9 Quick Start Guide - Page 12
Grounding the Chassis, The UC 540 is not NEBS-compliant.
![]() |
UPC - 882658285257
View all Linksys UC540W-BRI-K9 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 12 highlights
275428 STEP 3 Attach the power supply bracket to the wall. The following illustration shows the wall-mount bracket for the power supply and the mounting-screw holes on the back of the bracket. Mounting screws (2) a. Attach the bracket to the wall by using the mounting hardware specified in Step 1. b. Orient the front and back of the power supply vertically. c. Position the end nearest the power cable at the top. Grounding the Chassis The UC 540 chassis must be reliably grounded with a supplementary ground wire to comply with the relevant product safety standards. This supplementary ground is in addition to the ground connection made by the power cord. For the supplementary ground connection, use size 14 AWG (2 mm) or larger copper wire and an appropriate user-supplied ring terminal with an inner diameter of 1/4 inch (5 to 7 mm). NOTE The UC 540 is not NEBS-compliant. To connect the chassis to a reliable earth ground: STEP 1 Strip one end of the ground wire to the length required for the ground lug or terminal. • For the ground lug, strip approximately 0.75 in. (20 mm). • For the user-provided ring terminal, as required. Cisco Unified Communications 500 Series Model UC 540 Quick Start Guide 11
![](/manual_guide/products/linksys-uc540wbrik9-quick-start-guide-a95387e/12.png)