Maytag MDB7959SK Owners Manual - Page 16
CONNECT WATER LINE TO FILL VALVE, Leveling leg adjustment, Copper Water Line
View all Maytag MDB7959SK manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 16 highlights
11. Measure cabinet opening CONNECT WATER LINE TO FILL VALVE - For Copper line, begin with Step 12 - For Flexible line, begin with Step 14 12. Copper Water Line Measure the height of cabinet opening from the underside of the countertop to the floor where the dishwasher will be installed. Be sure to measure the lowest point on the underside of the countertop and the highest point on the floor. Leveling leg adjustment If using copper tubing, measure overall length of copper tubing required to reach the water supply, cut to length, and attach with compression fittings. Use wrench to initially loosen leveling legs if needed. Adjust all four leveling legs to the same height by rotating each foot clockwise or counterclockwise as needed. The unit comes with the legs set for a 331/2" (85.1 cm) height installation. If your opening height is 341/2" (87.6 cm), you would therefore need to lower all four legs by 1" (2.54 cm). NOTE: Adjust rear leg height first before moving unit into the cut out. Legs can be removed if necessary for tight installations. 16