Netgear GSM7212P GSM5212P/GSM7212P/GSM7212F/GSM7224P Administration Manual - Page 325
CLI: Con a Stacking Port as an Ethernet Port, On Switch A, Con the Stack Port and Reboot
View all Netgear GSM7212P manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 325 highlights
ProSafe Managed Switch CLI: Configure a Stacking Port as an Ethernet Port 1. On Switch A, Configure the Stack Port and Reboot (Netgear Switch) #show stack-port Configured Running Link Stack Stack Link Speed Unit Intf SlotId Type XFP Adapter Mode Mode Status (Gb/s) ----- 2 0/27 None Stack Stack Link Down 0 2 0/28 AX742 (stack) Stack Stack Link Down 12 (Netgear Switch) #config (Netgear Switch) (Config)#stack (Netgear Switch) (Config-stack)#stack-port 2/0/28 ethernet (Netgear Switch) (Config-stack)#exit (Netgear Switch) (Config)#exit (Netgear Switch) #reload Are you sure you want to reload the stack? (y/n) y After Switch A reboots: (Netgear Switch) #show port 2/0/28 Admin Physical Physical Link Intf Type Mode Mode Status Status 2/0/28 Enable 10G Full 10G Full Up Link Trap ------Enable LACP Mode ------Enable Actor Timeout -----long 2. On Switch B, Configure the stack port and reboot. (Netgear Switch) # (Netgear Switch) #show stack-port Configured Running Stack Stack Unit Intf SlotId Type XFP Adapter Mode Mode 1 0/51 AX742 (stack) Ethernet Ethernet 1 0/52 AX741 Ethernet Ethernet Link Link Speed Status (Gb/s) ----- ----- Link Down 12 Link Down 10 (Netgear Switch) #config (Netgear Switch) (Config)#stack (Netgear Switch) (Config-stack)#stack-port 1/0/51 ethernet (Netgear Switch) (Config-stack)#exit (Netgear Switch) (Config)#exit (Netgear Switch) #reload Are you sure you want to reload the stack? (y/n) y Chapter 19. Switch Stacks | 325