Panasonic Toughpad FZ-G1 Operating Instructions - Page 18
First-time Operation - battery
View all Panasonic Toughpad FZ-G1 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 18 highlights
Getting Started First-time Operation n Preparation A Check and identify the supplied accessories. If you do not find the described accessories, contact Panasonic Technical Support (è page 47). • AC Adaptor. . . 1 • AC Cord. . . . . 1 • Battery Pack 1 • Digitizer pen 1 Model No: CF- Model No: FZ-VZSU84U AA6413C • Tether 1 • Soft Cloth. . . . 1 è Reference Manual "Screen Input Operation" è Reference Manual "Screen Input Operation" • OPERATING INSTRUCTIONS (This book 1 B Read the LIMITED USE LICENSE AGREEMENT before breaking the seal on the computer's packaging (è page 38). 1 A 1 Inserting the Battery Pack. Turn over the computer and insert the battery pack until it touch to the secured position. l Make sure no foreign objects are under the computer. CAUTION B l Make sure the latch is securely locked. Otherwise the battery pack may fall when you carry the computer. l Do not touch the terminals of the battery pack and the computer. Doing so can make the terminals dirty or damaged, and may cause malfunction of the battery pack and the computer. NOTE l Note that the computer consumes electricity even when the computer power is off. If the battery pack is fully charged, the battery will fully discharge in the following period of time: Status Discharge period When power is off Approx. 6 weeks In sleep Approx. 4 days In hibernation Approx. 7 days 18