ProForm 19.0 Re Elliptical English Manual - Page 10

Tip: To prevent the Main Wire Harness 60

Page 10 highlights

3. Orient the Front Stabilizer (3) so that the small welded tubes are facing away from the Main 3 Frame (1). Attach the Front Stabilizer (3) to the Main Frame (1) with two M10 x 95mm Screws (100). Welded Tubes 100 3 1 4. Orient the Upright (5) and the Top Cover (27) as shown, and slide the Top Cover upward onto the Upright. Have a second person hold the Upright (5) and the Top Cover (27) near the Main Frame (1). Locate the wire tie in the Upright (5). Tie the lower end of the wire tie to the Main Wire Harness (60). Next, pull the upper end of the wire tie until the Main Wire Harness is routed through the Upright. Tip: To prevent the Main Wire Harness (60) from falling into the Upright (5), secure the Main Wire Harness with the wire tie. Tip: Avoid pinching the Main Wire Harness (60). Slide the Upright (5) onto the Main Frame (1). Attach the Upright (5) with four M8 x 16mm Screws (102) and four M8 Split Washers (103); do not tighten the Screws yet. Slide the Top Cover (27) downward; do not press the Top Cover onto the Frame Covers (21, 22) yet. 4 Wire Tie Avoid pinching the Main Wire Harness (60) 5 102 103 102 27 22 102 103 Wire Tie 60 1 21 10

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40

10
4.
Orient the Upright (5) and the Top Cover (27) as
shown, and slide the Top Cover upward onto the
Upright.
Have a second person hold the Upright (5) and
the Top Cover (27) near the Main Frame (1).
Locate the wire tie in the Upright (5). Tie the
lower end of the wire tie to the Main Wire
Harness (60). Next, pull the upper end of the
wire tie until the Main Wire Harness is routed
through the Upright.
Tip: To prevent the Main Wire Harness (60)
from falling into the Upright (5), secure the
Main Wire Harness with the wire tie.
Tip: Avoid pinching the Main Wire Harness
(60).
Slide the Upright (5) onto the Main Frame
(1).
Attach the Upright (5) with four M8 x 16mm
Screws (102) and four M8 Split Washers (103);
do not tighten the Screws yet.
Slide the Top Cover (27) downward;
do not
press the Top Cover onto the Frame Covers
(21, 22) yet.
4
Wire Tie
Wire Tie
5
27
60
21
22
1
103
103
102
102
102
Avoid pinching
the Main Wire
Harness (60)
3.
Orient the Front Stabilizer (3) so that the small
welded tubes are facing away from the Main
Frame (1).
Attach the Front Stabilizer (3) to the Main Frame
(1) with two M10 x 95mm Screws (100).
3
Welded
Tubes
3
1
100