Reebok S 9.80 Treadmill English Manual - Page 8

second Bolt Spacer 77, 3/8 x 4 1/2 Bolt

Page 8 highlights

4. With the help of a second person, hold a Bolt Spacer (77) inside the lower end of the Right 4 Upright (78). Next, insert a 3/8" x 4 1/2" Bolt (6) with a 3/8" Star Washer (9) into the Right Upright and the Bolt Spacer. Repeat this step with a second Bolt Spacer (77), 3/8" x 4 1/2" Bolt (6), and 3/8" Star Washer (9). Then, set the Right Upright in the Right Upright Spacer (79). Be careful not to pinch the Wire Harness (38). Partially tighten the 3/8" x 4 1/2" Bolts (6); do not fully tighten the Bolts yet. 6 78 9 79 38 77 5. With the help of a second person, carefully tip the treadmill onto its right side. Partially fold the Frame (56) so the treadmill is more stable; do not fully fold the Frame yet. Remove and discard the two indicated bolts (A) and the shipping bracket (B). Attach a Base Foot (81) to the Base (83) in the location shown with a #8 x 1" Tek Screw (2) and a Base Foot Spacer (13). Then, attach another Base Foot (81) with only a #8 x 1" Tek Screw (2). Attach a Wheel (84) to the Base (83) with a 3/8" x 2" Bolt (4) and a 3/8" Nut (8). Do not overtighten the Nut; the Wheel must turn freely. 5 A 81 2 B 83 56 4 13 2 81 84 8 6. Set the Left Upright Spacer (76) on the Base (83). With the help of a second person, hold a Bolt Spacer (77) inside the lower end of the Left Upright (74). Next, insert a 3/8" x 4 1/2" Bolt (6) with a 3/8" Star Washer (9) into the Left Upright and the Bolt Spacer. Repeat this step with a second Bolt Spacer (77), 3/8" x 4 1/2" Bolt (6), and 3/8" Star Washer (9). Then, set the Left Upright in the Left Upright Spacer. Partially tighten the 3/8" x 4 1/2" Bolts (6); do not fully tighten the Bolts yet. With the help of a second person, tip the treadmill so that the Base (83) is flat on the floor. 6 6 9 77 74 76 83 8

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

8
6.
Set the Left Upright Spacer (76) on the Base
(83). With the help of a second person, hold a
Bolt Spacer (77) inside the lower end of the Left
Upright (74). Next, insert a 3/8" x 4 1/2" Bolt (6)
with a 3/8" Star Washer (9) into the Left Upright
and the Bolt Spacer.
Repeat this step with a
second Bolt Spacer (77), 3/8" x 4 1/2" Bolt
(6), and 3/8" Star Washer (9).
Then, set the
Left Upright in the Left Upright Spacer.
Partially tighten the 3/8" x 4 1/2" Bolts (6);
do
not fully tighten the Bolts yet.
With the help of a second person, tip the tread-
mill so that the Base (83) is flat on the floor.
76
74
6
83
77
6
5.
With the help of a second person, carefully tip
the treadmill onto its right side. Partially fold the
Frame (56) so the treadmill is more stable;
do
not fully fold the Frame yet.
Remove and discard the two indicated bolts (A)
and the shipping bracket (B).
Attach a Base Foot (81) to the Base (83) in the
location shown with a #8 x 1" Tek Screw (2) and
a Base Foot Spacer (13). Then, attach another
Base Foot (81) with only a #8 x 1" Tek Screw (2).
Attach a Wheel (84) to the Base (83) with a 3/8"
x 2" Bolt (4) and a 3/8" Nut (8).
Do not over-
tighten the Nut; the Wheel must turn freely.
5
83
84
56
4
8
81
2
81
13
2
4.
With the help of a second person, hold a Bolt
Spacer (77) inside the lower end of the Right
Upright (78). Next, insert a 3/8" x 4 1/2" Bolt (6)
with a 3/8" Star Washer (9) into the Right
Upright and the Bolt Spacer.
Repeat this step
with a second Bolt Spacer (77), 3/8" x 4 1/2"
Bolt (6), and 3/8" Star Washer (9).
Then, set
the Right Upright in the Right Upright Spacer
(79).
Be careful not to pinch the Wire
Harness (38).
Partially tighten the 3/8" x 4 1/2" Bolts (6);
do
not fully tighten the Bolts yet.
79
78
77
6
4
38
9
9
B
A