Samsung SCC-C7478C User Guide - Page 12
sequence as shown in the picture bellow.
![]() |
View all Samsung SCC-C7478C manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 12 highlights
Installation ⑨ Close the dome cover. Care must be taken to locate dome cover by matching the "Arrow" mark. ⑩ Tighten four screws on the dome cover in sequence as shown in the picture bellow 4 ٻ 1 2 ٻ 3 To maintain the best sealing, the torque of each screw must be in the range between 0.5 ~ 1.0 N·m (0.37 ~ 0.73 lbf·ft). 12 - 36x SMART DOME CAMERA
![](/manual_guide/products/samsung-sccc7478-user-guide-39b2ab9/12.png)
12
– 36x SMART DOME CAMERA
Installation
⑨
Close the dome cover. Care must be taken to
locate dome cover by matching the “Arrow”
mark.
⑩
Tighten four screws on the dome cover in
sequence as shown in the picture bellow.
a
To maintain the best sealing, the torque of each
screw must be in the range between 0.5 ~ 1.0 N·m
(0.37 ~ 0.73 lbf·ft).
1
2
3
4