TP-Link TL-ER6020 TL-ER6020 v1 IG 7106503927 - Page 19
Verify Installation, ´1´, Power On, Initialization, ´1µ
![]() |
View all TP-Link TL-ER6020 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 19 highlights
Gigabit Dual-WAN VPN Router Note: ■■ The console port is the first port on the right of the front panel. ■■ Please keep the device power off when you plugging the console cable. ■■ Do not connect the console port with other ports by RJ45 cable. 4444 Verify Installation After completing the installation, please verify the following items: ■■ There are 5~10cm of clearance around the sides of the device for ventilation and the air flow is adequate. ■■ The voltage of the power supply meets the requirement of the input voltage of the device. ■■ The power socket, device and rack are well grounded. ■■ The device is correctly connected to other network devices. 4444 Power On Plug in the negative connector of the provided power cord into the power socket of the device, and the positive connector into a power outlet as the following figure shown. FFFFFFFFFFF Connecting to Power Supply Note: The figure is to illustrate the application and principle. The power plug you get from the package and the socket in your situation will comply with the regulation in your country, so they may differ from the figure above. 4444 Initialization After the device is powered on, it begins the Power-On Self-Test. A series of tests run automatically to ensure the device functions properly. During this time, its LED indicators will respond as follows: ■■ The Power LED lights on all the time. ■■ All LEDs except PWR LED flashes momentarily and then turns off. ■■ The SYS LED flashes every second continuously, which means the initialization is finished. Connection 15
![](/manual_guide/products/tplink-tler6020-tler6020-v1-ig-7106503927-71e66a8/19.png)