TP-Link TL-SG1008PE Installation Guide - Page 17
Connect to Ground
View all TP-Link TL-SG1008PE manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 17 highlights
Gigabit Unmanaged Switch Cable Pave Way 2~5kVA powerline >5kVA powerline Parallel cabling One is in the grounded metal raceway or metal pipe The both are in the grounded metal raceway or metal pipe Parallel cabling One is in the grounded metal raceway or metal pipe The both are in the grounded metal raceway or metal pipe Min Parallel Length (mm1 300 150 80 600 300 150 Device Switch case Transformer room Elevator tower Air-conditioner room Min Distance (m1 1.00 2.00 2.00 2.00 3333 Connect to Ground Connecting the device to ground is to quickly release the lightning over-voltage and over-current of the device, which is also a necessary measure to protect the body from electric shock. In different environments, the device may be grounded differently. The following will instruct you to connect the device to the ground in two ways, connecting to the grounding bar or connecting to the ground via the power cord. Please connect the device to ground in the optimum way according to your specific operation environment. ■■ Connecting to the Grounding Bar If the device is installed in the Equipment Room, where a grounding bar is available, you are recommended to connect the device to the grounding bar as shown in the following figure. Switch (Rear Panel) Ground Cable Grounding Terminal Grounding Bar FFFFFFFFFFF Connecting to the Grounding Bar Lightning Protection 12