TP-Link TL-SG1008PE Installation Guide - Page 22

Initialization

Page 22 highlights

Gigabit Unmanaged Switch Note: The figure is to illustrate the application and principle. The power plug you get from the package and the socket in your situation will comply with the regulation in your country, so they may differ from the figure above. 4444 Initialization After the device is powered on, it begins the Power-On Self-Test. A series of tests run automatically to ensure the device functions properly. During this time, its LED indicators will respond as follows: ■■ All of the LED indicators will flash momentarily for one second, which represents a resetting of the system. ■■ The Power LED indicator will light up. 17 Connection

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

17
Gigabit Unmanaged Switch
Note:
The figure is to illustrate the application and principle. The power plug you get
from the package and the socket in your situation will comply with the regulation in
your country, so they may differ from the figure above.
Initialization
212
After the device is powered on, it begins the Power-On Self-Test. A series of tests run
automatically to ensure the device functions properly. During this time, its LED indica-
tors will respond as follows:
All of the LED indicators will flash momentarily for one second, which represents a
resetting of the system.
The Power LED indicator will light up.
Connection