ViewSonic PJ1158 PJ1158-1 User Guide, English - Page 88

day No. 2' and so on.

Page 88 highlights

Controlling the Projector via Scheduling Controlling the Projector via Scheduling The projector can be automatically controlled via scheduling. NOTE • You can schedule the following control events: Power ON/OFF, Input Source and Transferred Image Display. • There are 3 types of Scheduling, 1) daily 2) day of the week 3) specific date. • The priority for scheduled events is as follows 1) specific date 2) day of the week 3) daily. • Up to five specific dates are available for scheduled events. Priority is given to those with the lower numbers when more than one event has been scheduled for the same date and time (e.g., 'Specific day No. 1' has priority over 'Specific day No. 2' and so on. • Be sure to set the date and time before enabling scheduled events. ViewSonic PJ1158 83

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115

Controlling the Projector via Scheduling
Controll±ng the Projector v±a Schedul±ng
The projector can be automat±cally controlled v±a schedul±ng.
• You can schedule the follow±ng control events: Power ON/OFF, Input
Source and Transferred Image D±splay.
• There are 3 types of Scheduling, 1) daily 2) day of the week 3) specific date.
• The priority for scheduled events is as follows 1) specific date 2) day of the
week 3) da±ly.
• Up to five specific dates are available for scheduled events. Priority is given to
those w±th the lower numbers when more than one event has been scheduled
for the same date and time (e.g., ‘Specific day No. 1’ has priority over ‘Specific
day No. 2’ and so on.
• Be sure to set the date and t±me before enabl±ng scheduled events.
NOTE
83
ViewSonic
PJ1158