ViewSonic PM-FCP Instruction Manual - Page 10

PM-FCP Adjustments

Page 10 highlights

Electrical Box Installation PM-FCP Electrical installation should be done in accordance to local codes and regulations. Step 1. Cut the tile where the electrical base box is going to be secured. Step 2. Using (commercially available) hardware depending on electrical installation environment, install the electrical box and secure it to the plate. Step 3. Make all electrical connections at this time. Electrical Box Electrical Box Cut-out PM-FCP Adjustments Step 1. Loosen the M8 x 20mm screws and M8 flat washers. This will allow you to slide the base box laterally. Ceiling Tile PM-FCP M8 Flat Washer M8 x 20mm Phillips Head Screw Please refer to the purchased base box for further operating instructions. Page 10 Installation Instructions

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12

Page 10
Installation Instructions
PM-FCP
Ceiling Tile
PM-FCP
M8 Flat
Washer
M8 x 20mm
Phillips Head
Screw
PM-FCP Adjustments
Step 1.
Loosen the M8 x 20mm screws and M8 flat washers. This will allow you to slide the base box laterally.
Please refer to the purchased base box for further operating instructions.
Electrical installation should be done in accordance to local codes and regulations.
Step 1.
Cut the tile where the electrical base box is going to be secured.
Step 2.
Using (commercially available) hardware depending on electrical installation environment, install the electrical box and secure
it to the plate.
Step 3.
Make all electrical connections at this time.
Electrical Box Installation
Electrical Box
Cut-out
Electrical Box