ViewSonic PM-FCP Instruction Manual - Page 6
PM-FCP Installation
View all ViewSonic PM-FCP manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
Eye Lag Screw PM-FCP Permanent Mounting Structure Eye Lag Screw Braided Cable T-bar Frame Ceiling Tile Step 1. Attach the braided cable, using the directions on page 5, in the appropriate manner for your mounting configuration. Step 2. Let the four (4) strands of braided cable hang down off to one side of the opening in the ceiling. PM-FCP Installation 24"x24" Ceiling Tile Mounting Studs on the Bottom Dual Knock Outs 24" 'T' Bar (Commercially Available) The dual knock out plates for the electrical box must be removed prior to installation. 24"x48" Ceiling Tile Ceiling Step 1. Install the PM-FCP plate securely onto the T-bar framework with the mounting studs face down (according to your installation configuration). In the event that you are using the PM-FCP in an opening that is 24" x 48", a 24" piece of T-bar (commercially available) must be used to support the mount and ceiling tile. The T-bar (commercially available) will run from side to side and help support the PM-FCP and 24" x 24" replacement ceiling tile (commercially available). Page 6 Installation Instructions