Viking 18" Fully Integrated All Freezer with Custom Panel Installation Instruc - Page 22

Performance Checklist, Verify Operations

Page 22 highlights

Performance Checklist -Verify cabinet size. -Verify electrical supply and water supply (if applicable). -Install anti-tip device(s) and verify unit is secure. -Position unit in cutout, level at desired height and secure unit. -Plug-in unit and verify operation. -Connect water supply (if applicable). • Verify icemaker fill tube is properly inserted. • Verify icemaker bail arm is down. • Verify dispenser operation (if applicable). -Align/square door(s). -Verify drain pan is properly installed and there are no leaks on water connection. -Install kickplate. -Remove internal packaging and labels and wipe unit down. Verify Operations Control Panel VRI/FRI/MVRI7240 VFI/FFI/MVFI7240 VFI/FFI/MVFI7180 22

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24

22
Performance Checklist
—Verify cabinet size.
—Verify electrical supply and water supply (if applicable).
—Install anti-tip device(s) and verify unit is secure.
—Position unit in cutout, level at desired height and secure unit.
—Plug-in unit and verify operation.
—Connect water supply (if applicable).
Verify icemaker fill tube is properly inserted.
• Verify icemaker bail arm is down.
Verify dispenser operation (if applicable).
—Align/square door(s).
—Verify drain pan is properly installed and there are no leaks on
water connection.
—Install kickplate.
—Remove internal packaging and labels and wipe unit down.
Verify Operations
Control Panel
VRI/FRI/MVRI7240
VFI/FFI/MVFI7240
VFI/FFI/MVFI7180