Weber Summit FT 400 LP Owners Manual - Page 26
Install left work surface and glides
![]() |
View all Weber Summit FT 400 LP manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 26 highlights
Step 24 Install left work surface and glides You will need: left work surface, two nylon (plastic) glides, two Phillips head 1/4-20 x 1 inch machine screws and a Phillips screwdriver. Set the left work surface over the top of the cooking box and the top frame rails. Figure 36. The left work surface will cover half of the handles on the left side. Position the glide as shown in figure 36 (a). Align the front hole in the left work surface and the glide. Thread screw in and tighten with a Phillips screwdriver. Figure 36 (b). Repeat the procedure with the second glide at the rear of the left work surface. ƽWARNING: The load limit for the work surface is 25 pounds. (a) Step 25 Install right work surface and glides You will need: right work surface, two nylon (plastic) glides, two Phillips head 1/4-20 x 1 inch machine screws and a Phillips screwdriver. Set the right work surface over the top of the cooking box and the top frame rails. Figure 37. The right work surface will cover half of the handles on the right side. Position the glide as shown in figure 37 (a). Align the front hole in the right work surface and the glide. Thread screw in and tighten with a Phillips screwdriver. Figure 37 (b). Repeat the procedure with the second glide at the rear of the right work surface. ƽWARNING: The load limit for the work surface is 25 pounds. (a) (b) (b) Figure 36 Figure 37 26
![](/manual_guide/products/weber-summit-ft-400-lp-owners-manual-8560855/26.png)