Weider Cross Bow By 1500e English Manual - Page 10

Locate the Long Cable 80.

Page 10 highlights

16. Locate the Fulcrum (18) on the Lat Tower (4) (see the inset drawing). Slide the Tray (35) onto the rods on the Fulcrum. Make sure the Tray is oriented as shown in the drawing. Set the Resistance Bars into the Tray (35) in the following order: the 10-pound Removable Resistance Bar (67), the 20-pound Removable Resistance Bar (36), an 80-pound Resistance Bar (95), the 10-pound Center Resistance Bar (44), an 80-pound Resistance Bar (95), and the 40-pound Resistance Bar (96). Make sure the indicated rings are on the side shown and the arrows point toward the tray. Orient the Cover Plate (72) as shown with the back facing away from the Lat Tower (4). Attach the Cover Plate to the Tray (35) with two M8 x 19mm Button Head Screws (86). 17. Locate the Long Cable (80). Insert one end of the Cable through the welded tube on the indicated end of the Cross Tube (11) and then through a Swivel Arm (22). If necessary, use the tip of a screwdriver to pull the end of the Cable out of the Swivel Arm. Make sure the Cable is on the indicated side of the welded rod in the Swivel Arm. Insert the Swivel Arm (22) into the welded tube on the Cross Tube (11). Secure the Swivel Arm with an M4 x 5mm Screw (104). Wrap the Long Cable (80) around a 90mm Pulley (28). Attach the Pulley inside of the Swivel Arm (22) with an M10 x 42mm Button Head Bolt (71) and an M10 Nylon Locknut (76). 18. Wrap the Long Cable (80) around a 90mm Pulley (28). Attach the Pulley and a Pulley Guard (29) to the indicated M10 x 140mm Carriage Bolt (73) with an M10 Nylon Locknut (76). Make sure the flat edge of the Pulley Guard is on the side shown. 19. Attach a Pulley Housing (94) to the indicated "U"channel on the 10-pound Center Resistance Bar (44) with an M10 x 102mm Button Head Bolt (24), two Pivot Bushings (74), and an M10 Nylon Locknut (76). Wrap the Long Cable (80) around a 90mm Pulley (28). Attach the Pulley inside of the Pulley Housing (94) with an M10 x 42mm Button Head Bolt (71) and an M10 Nylon Locknut (76). 16 86 Back 72 Rings on this side 4 35 18 18 17 44 Rods 67 96 95 95 36 80 71 11 104 22 28 Rod 76 18 Flat Edge 29 76 80 73 28 19 44 76 74 71 28 74 80 "U"-Channel 76 94 24 10

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24

10
19. Attach a Pulley Housing (94) to the indicated ā€œUā€-
channel on the 10-pound Center Resistance Bar
(44) with an M10 x 102mm Button Head Bolt (24),
two Pivot Bushings (74), and an M10 Nylon
Locknut (76).
Wrap the Long Cable (80) around a 90mm Pulley
(28). Attach the Pulley inside of the Pulley
Housing (94) with an M10 x 42mm Button Head
Bolt (71) and an M10 Nylon Locknut (76).
19
24
94
28
80
44
76
76
71
74
74
18. Wrap the Long Cable (80) around a 90mm Pulley
(28). Attach the Pulley and a Pulley Guard (29) to
the indicated M10 x 140mm Carriage Bolt (73)
with an M10 Nylon Locknut (76).
Make sure the
flat edge of the Pulley Guard is on the side
shown.
18
76
28
80
73
29
Flat
Edge
16
86
72
Back
Rings on
this side
96
95
95
44
36
67
18
Rods
35
18
4
17.
Locate the Long Cable (80).
Insert one end of
the Cable through the welded tube on the indicat-
ed end of the Cross Tube (11) and then through a
Swivel Arm (22). If necessary, use the tip of a
screwdriver to pull the end of the Cable out of the
Swivel Arm.
Make sure the Cable is on the indi-
cated side of the welded rod in the Swivel Arm.
Insert the Swivel Arm (22) into the welded tube
on the Cross Tube (11). Secure the Swivel Arm
with an M4 x 5mm Screw (104).
Wrap the Long Cable (80) around a 90mm Pulley
(28). Attach the Pulley inside of the Swivel Arm
(22) with an M10 x 42mm Button Head Bolt (71)
and an M10 Nylon Locknut (76).
17
71
22
104
28
80
11
76
Rod
ā€œUā€-Channel
16. Locate the Fulcrum (18) on the Lat Tower (4) (see
the inset drawing). Slide the Tray (35) onto the
rods on the Fulcrum.
Make sure the Tray is ori-
ented as shown in the drawing.
Set the Resistance Bars into the Tray (35) in the
following order: the 10-pound Removable
Resistance Bar (67), the 20-pound Removable
Resistance Bar (36), an 80-pound Resistance Bar
(95), the 10-pound Center Resistance Bar (44), an
80-pound Resistance Bar (95), and the 40-pound
Resistance Bar (96).
Make sure the indicated
rings are on the side shown and the arrows
point toward the tray.
Orient the Cover Plate (72) as shown with the
back facing away from the Lat Tower (4). Attach
the Cover Plate to the Tray (35) with two M8 x
19mm Button Head Screws (86).