Weider Cross Bow By 1500e English Manual - Page 12

Locate the two Short Cables 33.

Page 12 highlights

24. Locate the Leg Lever Cable (32), which has two ends that are the same length and a third end that is longer. Route the longest end of the Leg Lever Cable (32) through the hole in the Front Leg (6), and attach it inside of the hole in the Leg Lever (7) with an M10 x 60mm Bolt (63) and an M10 Nylon Locknut (76). 25. Attach a 90mm Pulley (28) inside of the hole in the Front Leg (6) with an M10 x 91mm Bolt (90), two 26mm Spacers (52), two M10 Washers (75), and an M10 Nylon Locknut (76). Be sure that the Pulley is above the Leg Lever Cable (32). Slide the two free ends of the Leg Lever Cable (32) onto the hook welded to the bottom of the Bench Rail (5). 26. Locate the two Short Cables (33). Wrap one of the Cables around a 90mm Pulley (28). Attach the Pulley to a High Pulley Housing (21) with an M10 x 42mm Button Head Bolt (71) and an M10 Nylon Locknut (76). Repeat this step with the other Short Cable (33). 27. Slide the four Foam Pads (26) onto the tubes on the Front Leg (6) and the Leg Lever (7). Press four 19mm Round Inner Caps (78) into the ends of the tubes. 24 6 63 32 76 7 25 6 90 75 52 26 5 28 75 52 76 76 32 Hook 21 71 28 33 27 26 78 6 26 26 7 78 26 28. Make sure that all parts have been properly tightened. The use of the remaining parts will be explained in ADJUSTMENTS, beginning on the following page. Before using the resistance system, pull the long cable a few times to be sure that it moves smoothly over the pulleys. If the cable does not move smoothly, find and correct the problem. IMPORTANT: If the cables are not properly installed, they may be damaged when heavy resistance is used. See the CABLE DIAGRAM on page 16 for proper cable routing. 12

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24

12
27. Slide the four Foam Pads (26) onto the tubes on
the Front Leg (6) and the Leg Lever (7). Press
four 19mm Round Inner Caps (78) into the ends
of the tubes.
28.
Make sure that all parts have been properly tightened. The use of the remaining parts will be explained in
ADJUSTMENTS, beginning on the following page.
Before using the resistance system, pull the long cable a few times to be sure that it moves smoothly over
the pulleys. If the cable does not move smoothly, find and correct the problem.
IMPORTANT: If the cables
are not properly installed, they may be damaged when heavy resistance is used. See the CABLE
DIAGRAM on page 16 for proper cable routing.
27
26
78
78
26
7
6
26
26
26.
Locate the two Short Cables (33).
Wrap one of
the Cables around a 90mm Pulley (28). Attach
the Pulley to a High Pulley Housing (21) with an
M10 x 42mm Button Head Bolt (71) and an M10
Nylon Locknut (76).
Repeat this step with the other Short Cable
(33).
26
76
71
21
28
33
25. Attach a 90mm Pulley (28) inside of the hole in
the Front Leg (6) with an M10 x 91mm Bolt (90),
two 26mm Spacers (52), two M10 Washers (75),
and an M10 Nylon Locknut (76).
Be sure that
the Pulley is above the Leg Lever Cable (32).
Slide the two free ends of the Leg Lever Cable
(32) onto the hook welded to the bottom of the
Bench Rail (5).
24
25
76
32
6
63
7
75
75
90
6
52
28
32
Hook
5
24.
Locate the Leg Lever Cable (32),
which has two
ends that are the same length and a third end
that is longer.
Route the longest end of the Leg Lever Cable
(32) through the hole in the Front Leg (6), and
attach it inside of the hole in the Leg Lever (7)
with an M10 x 60mm Bolt (63) and an M10 Nylon
Locknut (76).
76
52