Weider E9000a Home Gym English Manual - Page 14

Illustration.

Page 14 highlights

WEIDER HEALTH •nd FITNESS STEP 9 PEC-DECK CABLE ASSEMBLY PAGE 13 PART NAME 75 3/8" NYLON LOCK NUT 83 3/8' X 2' HEX HEAD BOLT 85 5/16' NYLON LOCK NUT 86 5/16' X 6/8' HEX HEAD BOLT ' CITY 3 3 2 2 a For easier identification purposes only, the Pulleys willbe letteredA - C. AllPULLEYS (20) are the same (4'). a The Cable neededfor this step is PEC-DECK CABLE 108" (26). Start with either . one of the PEC-DECK ARMS (21) or (22). Bolt a Cable into the hole on the side of each Pec-Deck Arm using 51166 X 5/86 HEX HEAD BOLT (86) and 5116' NYLON LOCK NUT (85). See DetailIllustration. NOTE: This Cable must be assembled in front of PEC-DECK FRAME (3). Trap the Cable into the Welded Brackets on PEC-DECK MOUNTING ASSEMBLY (9) using PULLEYS A and C and secure wtih 3/8" X 2' HEX HEAD BOLT (83) and 3/8' NYLON LOCK NUT (75). 0 3 ({ 21 75 28 83 83 1Z- r 9 si t/i C.C111CI vi th e Cable that is draped toward the floor assemble PULLEY B and (rap in 4-BRACKET 75 WITH LATCH HOOK (28). Secure with 3/8" X 2' HEX HEAD BOLT (83) and3/8" NYLON LOCK NUT (75). 86 26 STEP 10 LOWER PULLEY ASSEMBLY 85 8 PART NAME 29 CHAIN 75 3/8' NYLON LOCK NUT 83 3/8' X 2' HEX HEAD BOLT 87 FIREMAN'S LATCH HOOK 'QTY 1 For easier identification purposes only, the Pulleys will be lettered A - D. 4 AllPULLEYS (20) are the same (4'). 4 1 a The Cable needed for this Step is LOWER CABLE 151' (25). u Start with the.Ball Stop End of the Cable. ' Extend the Cable throjgh the opening in the bottom of LEG EXTENSION (30). Leave some of the Cable end with Ball•Stop lay outside the opening until the entire assembly is done. u Assemble PULLEY A in. opening trapping Cable under the Pulley. Secure with 3/8" X 2' HEX HEAD BOLT (83) and 3/8' NYLON LOCK NUT (75). u Extend the Cable to the rear going through the square opening.at the bottom of ARM PRESS FRAME (2). U Trap Cable under PULLEY B in the first welded bracket on BASE FRAME (1) behind ARM PRESS FRAME (2). SOCUle PULLEY B with 3/8' X 2' HEX I-4EAD BOLT (83) and 318' NYLON LOCK NUT -(75).

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17

WEIDER
HEALTH
•nd
FITNESS
STEP
9
PEC-DECK
CABLE
ASSEMBLY
PAGE
13
PART
NAME
'
CITY
75
3/8"
NYLON
LOCK
NUT
3
83
3/8'
X
2'
HEX
HEAD
BOLT
3
85
5/16'
NYLON
LOCK
NUT
2
86
5/16'
X
6/8'
HEX
HEAD
BOLT
2
a
For
easier
identification
purposes
only,
the
Pulleys
will
be
lettered
A
-
C.
All
PULLEYS
(20)
are
the
same
(4').
a
The
Cable
needed
for
this
step
is
PEC-DECK
CABLE
108"
(26).
Start
with
either
.
one
of
the
PEC-DECK
ARMS
(21)
or
(22).
Bolt
a
Cable
into
the
hole
on
the
side
of
each
Pec-Deck
Arm
using
5116
6
X
5/8
6
HEX
HEAD
BOLT
(86)
and
5116'
NYLON
LOCK
NUT
(85).
See
Detail
Illustration.
NOTE:
This
Cable
must
be
assembled
in
front
of
PEC-DECK
FRAME
(3).
Trap
the
Cable
into
the
Welded
Brackets
on
PEC-DECK
MOUNTING
ASSEMBLY
(9)
using
PULLEYS
A
and
C
and
secure
wtih
3/8"
X
2'
HEX
HEAD
BOLT
(83)
and
3/8'
NYLON
LOCK
NUT
(75).
si
t/i
C.C111CI
vi
th
e
Cable
that
is
draped
toward
the
floor
assemble
PULLEY
B
and
(rap
in
4
-BRACKET
WITH
LATCH
HOOK
(28).
Secure
with
3/8"
X
2'
HEX
HEAD
BOLT
(83)
and
3
/
8
"
NYLON
LOCK
NUT
(75).
({
0
3
21
86
26
STEP
10
LOWER
PULLEY
ASSEMBLY
PART
NAME
'QTY
29
CHAIN
1
75
3/8'
NYLON
LOCK
NUT
4
83
3/8'
X
2'
HEX
HEAD
BOLT
4
87
FIREMAN'S
LATCH
HOOK
1
75
28
83
85
83
1
-
Zr
9
8
75
For
easier
identification
purposes
only,
the
Pulleys
will
be
lettered
A
-
D.
All
PULLEYS
(20)
are
the
same
(4').
a
The
Cable
needed
for
this
Step
is
LOWER
CABLE
151'
(25).
Start
with
the
.
Ball
Stop
End
of
the
Cable.
'
Extend
the
Cable
throjgh
the
opening
in
the
bottom
of
LEG
EXTENSION
(30).
Leave
some
of
the
Cable
end
with
Ball•Stop
lay
outside
the
opening
until
the
entire
assembly
is
done.
Assemble
PULLEY
A
in.
opening
trapping
Cable
under
the
Pulley.
Secure
with
3/8"
X
2'
HEX
HEAD
BOLT
(83)
and
3/8'
NYLON
LOCK
NUT
(75).
Extend
the
Cable
to
the
rear
going
through
the
square
opening
.at
the
bottom
of
ARM
PRESS
FRAME
(2).
U
Trap
Cable
under
PULLEY
B
in
the
first
welded
bracket
on
BASE
FRAME
(1)
behind
ARM
PRESS
FRAME
(2).
SOCUle
PULLEY
B
with
3/8'
X
2'
HEX
I-4EAD
BOLT
(83)
and
318'
NYLON
LOCK
NUT
-(75).