Weider Platinum Xp800 Canadian English Manual - Page 12

Upper Cable Adjustment - magnet

Page 12 highlights

UPPER CABLE ADJUSTMENT After completing the assembly of the resistance system, the tension on the upper cable will need to be adjusted. Also, the upper cable can stretch slightly when it is first used. When this occurs, the upper cable tension will need to be readjusted. Follow the steps below to adjust the upper cable tension. 1. Connect the two Tension Gauges (115, 116) 1 together using the magnet. 115 Magnet 116 2. Plug in the resistance system as described in PLUGGING IN THE RESISTANCE SYSTEM on page 16. Use the Console (not shown) to adjust the resistance setting of the system to the highest setting, as described in step two on page 16. Squeeze the Upper Cable (121) together near a Large Pulley (14). Hook the ends of the Tension Gauges (115, 116) around the Upper Cable as shown. Do not hook the ends of the Tension Gauges around the Tether (70), which is attached to the back of the Pulley Bracket (10). Slide the Tension Gauges (115, 116) next to the Large Pulley (14) as shown in the inset drawing. 3. Locate the 3/8" x 38mm Tension Screw (114) on each end of the Resistance Bar (9). Alternately tighten each Screw one turn at a time until the two Tension Gauges (115, 116) are pulled apart by the Upper Cable (121). The upper cable tension is now properly adjusted. 2 14 3 114 10 115 121 116 70 121 115 14 116 121 9 115 116 121 12

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27

12
After completing the assembly of the resistance system, the tension on the upper cable will need to be adjusted.
Also, the upper cable can stretch slightly when it is first used. When this occurs, the upper cable tension will
need to be readjusted. Follow the steps below to adjust the upper cable tension.
1.
Connect the two Tension Gauges (115, 116)
together using the magnet.
2.
Plug in the resistance system as described in
PLUGGING IN THE RESISTANCE SYSTEM on
page 16. Use the Console (not shown) to adjust
the resistance setting of the system to the highest
setting, as described in step two on page 16.
Squeeze the Upper Cable (121) together near a
Large Pulley (14). Hook the ends of the Tension
Gauges (115, 116) around the Upper Cable as
shown.
Do not hook the ends of the Tension
Gauges around the Tether (70), which is
attached to the back of the Pulley Bracket
(10).
Slide the Tension Gauges (115, 116) next to the
Large Pulley (14) as shown in the inset drawing.
3.
Locate the 3/8” x 38mm Tension Screw (114) on
each end of the Resistance Bar (9). Alternately
tighten each Screw one turn at a time until the
two Tension Gauges (115, 116) are pulled apart
by the Upper Cable (121).
The upper cable tension is now properly adjusted.
1
2
3
14
121
121
121
116
116
115
115
115
116
121
114
9
10
70
14
Magnet
115
116
UPPER CABLE ADJUSTMENT