Weider Pro 375 English Manual - Page 6
Locking Bar 34. Slide the Barbell 35 into
View all Weider Pro 375 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
3. Attach an Upright (1) to each Base (7) using four Joint Plates (12), eight M10 x 80mm Bolts (41), 3 and eight M10 Nylon Locknuts (11). Make sure the Uprights are oriented exactly as shown. Do not tighten the Nylon Locknuts yet. 1 41 7 1 12 7 12 11 12 12 41 4. Insert a Weight Guide (18) into the indicated hole 4 in each Base (7). Attach the Weight Guides to the Bases using two M10 x 75mm Bolts (39), four M10 Small Washers (6), and two M10 Nylon Locknuts (11). Do not tighten the Nylon Locknuts yet. 5. Press a 25mm Bushing (48) into each end of the Locking Bar (34). Slide the Barbell (35) into the Locking Bar. 18 39 6 5 7 6 11 18 11 39 6 76 48 34 35 48 6
6
3.
Attach an Upright (1) to each Base (7) using four
Joint Plates (12), eight M10 x 80mm Bolts (41),
and eight M10 Nylon Locknuts (11). Make sure
the Uprights are oriented exactly as shown.
Do
not tighten the Nylon Locknuts yet.
3
1
1
41
12
12
7
7
12
12
11
41
4.
Insert a Weight Guide (18) into the indicated hole
in each Base (7). Attach the Weight Guides to the
Bases using two M10 x 75mm Bolts (39), four
M10 Small Washers (6), and two M10 Nylon
Locknuts (11).
Do not tighten the Nylon
Locknuts yet.
5.
Press a 25mm Bushing (48) into each end of the
Locking Bar (34). Slide the Barbell (35) into the
Locking Bar.
4
18
18
39
39
6
11
7
7
11
6
6
6
5
34
35
48
48