Acer B247YC Lifecycle Extension Guide - Page 10

Disassemble the I/F BD and, P/BD from SHD.

Page 10 highlights

ACER B247Y 10 S8-2 Disassemble the I/F BD and P/BD from SHD. Unlock 5 screws from the PCBA as the picture 1. Disassemble the I/F BD from the SHD and extract the P/BD wire. Extract the FFC LVDS from the I/F BD. Disassemble the P/BD from the SHD and extract the P/BD wire from the Power BD. 5 4 IF/BD P/BD NOTE: Circuit boards >10 cm² has been highlighted with the yellow rectangle as above image shows. Please detach the Circuit boards and follow local regulations for disposal.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17

ACER B247Y
10
S8-2
Disassemble the I/F BD and
P/BD from SHD.
Unlock 5 screws from the PCBA as the picture 1.
Disassemble the I/F BD from the SHD and extract the P/BD wire.
Extract the FFC LVDS from the I/F BD.
Disassemble the P/BD from the SHD
and
extract the P/BD wire from the Power BD.
NOTE:
Circuit boards >10 cm² has been highlighted with the yellow rectangle as above image shows.
Please detach the Circuit boards and follow local regulations for disposal.
P/BD
IF/BD
4
5