Brother International BAS-311F-L Instruction Manual - English - Page 18

Connecting the ground wire, 3-11. Connecting the cords (Installing the operation panel)

Page 18 highlights

3. INSTALLATION 3-10. Connecting the ground wire CAUTION Be sure to connect the ground. If the ground connection is not secure, you run the risk of receiving a serious electric shock. Connection method for 3-phase power supply Red 3-phase White power supply Black Yellow/Green Yellow/Greeen Connect to ground 0064Q 3-11. Connecting the cords (Installing the operation panel) (8) (1) (9) 40 mm (4) (3) (2) 1 mm (7) (6) (5) 1. Assemble the operation panel stand (1) and cushion A (2). Then insert the bolts (4) together with the washers (3) into the three holes from above, and then tighten the nuts (5), washers (6) and cushion B (7) from below to secure the assembly. Note Tighten until the thickness of cushion B (7) becomes about 1 mm. 2. Pass the cords of the control panel assembly through the hole in the operation panel stand (1). 3. Attach the rubber sheet (8) to the hole in the operation panel stand (1) and then secure it with the bolt (9). 4. Insert the cord into the control box through the hole at the side of the box. Refer to page 13. 5. Secure the cord with the staples ( in two places). Note When opening the front cover, check that the code does not touch it. Front cover 1587Q BAS-311F-0, 311F-L, 326F-0 11

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81

3. INSTALLATION
BAS-311F-0, 311F-L, 326F-0
11
3-10. Connecting the ground wire
CAUTION
Be sure to connect the ground. If the ground connection is not secure, you run the risk of receiving a serious
electric shock.
Connection method for 3-phase power supply
3-11. Connecting the cords (Installing the operation panel)
1.
Assemble the operation panel stand (1) and cushion A
(2). Then insert the bolts (4) together with the washers
(3) into the three holes from above, and then tighten
the nuts (5), washers (6) and cushion B (7) from below
to secure the assembly.
Note
Tighten until the thickness of cushion B (7)
becomes about 1 mm.
2.
Pass the cords of the control panel assembly through
the hole in the operation panel stand (1).
3.
Attach the rubber sheet (8) to the hole in the operation
panel stand (1) and then secure it with the bolt (9).
4.
Insert the cord into the control box through the hole at
the side of the box. Refer to page 13.
5.
Secure the cord with the staples ( in two places).
Note
When opening the front cover, check that the code
does not touch it.
Red
White
Black
Yellow/Greeen
3-phase
power supply
Yellow/Green
0064Q
Connect to
ground
(4)
(3)
(8)
(1)
(9)
(2)
(7)
(6)
(5)
1 mm
40 mm
Front cover
1587Q