Compaq ProLiant 8500 Compaq Parallel Database Cluster Model PDC/05000 for Orac - Page 228
cabling to Fibre Channel SAN, Integrated Management Log, using
View all Compaq ProLiant 8500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 228 highlights
renaming default connection names 5-28 running the FCSS utility 5-34 Secure Path Agent 5-35 Secure Path drivers 5-35 Secure Path software 5-32 SmartStart 5-17 specifying Preferred_Path for storage units 5-36 verifying access to all virtual disks 5-31 verifying array controller properties 5-27 Integrated Management Log, using with Compaq Insight Manager 3-3 K KGPSA Host Adapters description 2-6 replacing 6-16 KGPSA-BC and KGPSA-CB Host adapter installation for Oracle8i 5-4 KGPSA-BC Host adapter device driver installation for Oracle8i 5-33 set registry parameters for 5-34 KGPSA-BC Host Adapters cabling to Fibre Channel SAN switches or hubs 5-5 KGPSA-BC initialization See device driver initialization L Large LUN utility configuring storagesets for MA8000/EMA12000 Storage Subsystems 5-30 installing the utility 5-36 introduction to configuring LUNs for storagesets 2-7, 7-18 Index 7 overview 3-5 specifying the Preferred_Path for storage units 5-36 lmhosts files for Ethernet cluster interconnect 4-21 for Oracle 8.1.7 5-40 for Oracle8i 5-19 local area network (LAN) 2-42 log files 6-4 for Oracle8i 5-55 logical drives expanding capacity 6-15 logical partitions in extended partitions 5-38 Oracle8i Parallel Server database resources 5-38 logical unit number 2-5 M MA8000/EMA12000 Storage Subsystem adding storagesets 6-14 adding to the cluster 6-19 cabling EMUs between subsystems 5-13 cabling the controller enclosure to disk enclosures 5-11 components 2-4 configuring 5-22 configuring storagesets in 5-29 connecting EMUs between subsystems 2-12 controller enclosure 2-4 description 2-4 disk enclosure 2-4 I/O modules in the controller enclosure 2-9 initial power on 5-21 installing hardware into a controller enclosure 5-10 installing hardware into a disk enclosure 5-10 maintenance terminal 5-21