D-Link DXS-3400 Quick Install Guide - Page 18
Installing Power Modules into the Power Module Slots, Installing an AC Power Module
View all D-Link DXS-3400 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 18 highlights
DXS-3400 Series Lite Layer 3 Stackable 10GbE Managed Switch Hardware Installation Guide generally used to connect this switch to optical fiber connections and can be used to connect devices to the Switch over great distances. The maximum distance that the RJ45 wiring connection can reach is 100 meters. Fiber optic connections can span several kilometers. The figure below illustrates how to properly insert SFP+ transceivers into the Switch's SFP+ ports. Figure 2-4 Inserting transceivers into the transceiver ports The SFP+ ports also support other transceiver form factors like SFP and SFP+ transceivers. A complete list of SFP/SFP+ transceivers, compatible with this switch, can be found the SFP+ Ports section in Appendix A - Technical Specifications at the end of this document. Installing Power Modules into the Power Module Slots The power module slots, located on the rear panel of this switch, support two types of power supply modules. AC Power Supply Module: DXS-PWR300AC: A 300 Watt AC power supply tray with front-to-back airflow. DC Power Supply Module: DXS-PWR300DC: A 300 Watt DC power supply tray with front-to-back airflow. Installing an AC Power Module Insert the AC power supply module into the power module slot until the clip clicks in place. Connect the one end of the AC power cord supplied to the AC power connector and the other end into a properly grounded electrical outlet. The Switch will automatically adjust the AC power setting to adapt to any voltage supply in the range from 100~240 VAC at 50~60 Hz. 18