Gateway 995 995 Series Server User Guide - Page 79
Remove the fan cage. For instructions, see
View all Gateway 995 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 79 highlights
Installing drives 6 Slide the tape drive into the tape drive bay until its front is flush with the front of the server. 7 Remove the top front panel from the server. For instructions, see "Removing the top front panel" on page 43. 8 Remove all six fans from the fan cage. For instructions, see "Replacing a fan" on page 58. 9 Remove the fan cage. For instructions, see "Replacing the fan cage" on page 59. 10 Plug a power cable and an SCSI cable into the back of the tape drive. 11 Reinstall the fan cage, then reinstall all six fans. 12 Reinstall the top front panel onto the server. www.gateway.com 73
73
Installing drives
www.gateway.com
6
Slide the tape drive into the tape drive bay until its front is flush with the
front of the server.
7
Remove the top front panel from the server. For instructions, see
“Removing the top front panel” on page 43
.
8
Remove all six fans from the fan cage. For instructions, see
“Replacing a
fan” on page 58
.
9
Remove the fan cage. For instructions, see
“Replacing the fan cage” on
page 59
.
10
Plug a power cable and an SCSI cable into the back of the tape drive.
11
Reinstall the fan cage, then reinstall all six fans.
12
Reinstall the top front panel onto the server.