GE CSB9120SJSS Installation Instructions - Page 7
Installation Preparation, Preparation, an Accessory Storage Drawer
View all GE CSB9120SJSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 7 highlights
Installation Preparation Preparation WITHOUT an Accessory Storage Drawer PREPARE THE OPENING (cont.) Installation over a GE/Monogram oven: 30s 23-1/2s 25-1/4s 17-1/2s Construct Solid Bottom Min. 3/8s Plywood Supported by 2 x 4 or 2 x 2 Runners all Four Sides 2s Min. (3s Recommended) Per Oven Requirement PREPARE THE OPENING (cont.) Installation over a GE/Monogram Oven and Warming Drawer: 30s 23-1/2s 25-1/4s 17-1/2s Construct Solid Bottom Min. 3/8s Plywood Supported by 2 x 4 or 2 x 2 Runners all Four Sides 2s Min. (3s Recommended) Per Oven Requirement • If you are replacing a GE/Monogram electric double oven with the combined installation of an Advantium 120V and a single oven, use the dimensions shown. The middle rail separating the two openings may need to be larger than the 2s minimum shown. Per Warming Drawer Requirement 2s Min. (3s Recommended) NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height. See Warming Drawer installation instructions for details. CAUTION: For personal safety, the mounting surface must be capable of supporting the cabinet load, in addition to the added weight of this approximate 80-pound oven, plus additional oven loads of up to 50 pounds or a total weight of 130 pounds. PRECAUCIÓN: Para seguridad personal, la superficie de montaje debe poder soportar la carga del gabinete, además del peso aproximado de 80 libras del horno, más las cargas adicionales del horno de hasta 50 libras o un peso total de hasta 130 libras. 7