GE CSB9120SJSS Installation Instructions - Page 8
Caution, PrecauciÓn
View all GE CSB9120SJSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 8 highlights
Installation Preparation Preparation WITHOUT an Accessory Storage Drawer PREPARE THE OPENING (cont.) Installation over another GE/Monogram Under-the-Counter (UTC) oven: 30s 23-1/2s 25-1/4s 17-1/2s Construct Solid Bottom Min. 3/8s Plywood Supported by 2 x 4 or 2 x 2 Runners all Four Sides 2s Min. (3s Recommended) PREPARE THE OPENING (cont.) Installation under a GE/Monogram Microwave Oven and over a Warming Drawer: 30s 23-1/2s 25-1/4s Per Oven Requirement Construct Solid Bottom Min. 3/8s Plywood Supported by 2 x 4 or 2 x 2 Runners all Four Sides 3.5s Min. (4.5s Recommended) 17-1/2s 17-1/2s Per Warming Drawer Requirement 2s Min. (3s Recommended) • If you are mounting an Under-the-Counter GE/Monogram oven over another, use the dimensions shown. The middle rail separating the two openings may need to be larger than the 2s minimum shown. NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height. See Warming Drawer installation instructions for details. CAUTION: For personal safety, the mounting surface must be capable of supporting the cabinet load, in addition to the added weight of this approximate 80-pound oven, plus additional oven loads of up to 50 pounds or a total weight of 130 pounds. PRECAUCIÓN: Para seguridad personal, la superficie de montaje debe poder soportar la carga del gabinete, además del peso aproximado de 80 libras del horno, más las cargas adicionales del horno de hasta 50 libras o un peso total de hasta 130 libras. 8