GE CSB9120SJSS Installation Instructions - Page 9
Prepare The Opening Cont.
View all GE CSB9120SJSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 9 highlights
Installation Preparation Preparation WITHOUT an Accessory Storage Drawer PREPARE THE OPENING (cont.) Installation beside another GE/Monogram Built-in Speedcook Oven: • If you are mounting one Under-the-Counter GE/Monogram oven beside the other, use the dimensions shown. The middle rail separating the two openings may need to be larger than the 4-1/2s minimum shown. 23-1/2s 25-1/4s 17-1/2s 25-1/4s 17-1/2s 4-1/2s Min. (5-1/2s Recommended) PREPARE THE OPENING (cont.) Installation under a GE/Monogram 30s or 36s Cooktop or Countertop: Gas or electric cooktops may be installed over this oven. See cooktop installation instructions for the cutout size. See the label on top of the oven for approved cooktop models. This oven requires a separate, properly grounded 15-Amp, 120-Volt, 60Hz power supply. The cooktop requires a separate power supply. Use a 36s or wider base cabinet. 1-1/2s Min. 25s Cooktop Cooktop 36s Countertop Height 23-1/2s 25-1/4s 17-1/2s Cooktop height including depth of electrical box on some models. Refer to cooktop installation instructions. No minimum clearance required between cooktop and oven. 4s High Toekick NOTE: The oven is only approved to be installed under the specific models as labeled on the unit. 9