Introduction Preparation Tools for installation Following are necessary tools for installation: 1. Screw drivers (normal, 6. Spanne(14* 17* 19* Philips-head and tricorn) 24 and 27mm) 2. Hacksaw 3. 60mm drill 4. Socket screw wrench 7. Pipe cutter 8. Expander 9. Knife 5. Adjustable spanner Following materials are prepared by the owner: 10. Pliers 11. Leak tester and soap solution 12. Steel tape 13. Scraper and file 14.Refrigeration oil(polyol ester) Code A B C Material 1-side adhesive tape 2-sided adhesive tape Connection hose D Water-proof insulation material E Gesso F Drainage hose Power supply requirements: Voltage: single-phase1PH,220-230V**50Hz Dedicated electrical cable(30A)should be installed by a qualified technician in accordance with the state regulation for electrical engineering. The power source must be grounded. A circuit breaker must be installed Electrical cables should be connected by ìYî method. Damaged or wornelectrical cable must be replaced by authorized after sales agents. The power plug should be connected as follows: L for live line, N for neutral line and for grounding. Connection parameters: H05RN-F*3G(1.0-1.5)mm 2 Signal parameters: H05RN-F*2X(0.75-1.5) mm2 *Shielded wire* Cables for power supply, connection and signals are prepared by the owner. Specifications Connection duct dime- Liquid pipe nsions Gas pipe Copper tube option AB092FCBHA O 6.35(1/4") O 9.52(3/8") AB142FCBHA O 6.35(1/4") O12.7(1/2") AB182FCBHA O 9.52(1/4") O15.88(1/2") 15

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

15
Preparation
Voltage: single-phase1PH,220-230V
**50Hz
The power source must be grounded.
Connection parameters: H05RN-F
*
Signal parameters:
Tools for installation
Following materials are prepared by the owner:
Following are necessary tools for installation:
1
2
3
60mm drill
4
5
.
Screw drivers (normal,
Philips-head and tricorn)
.
Hacksaw
.
.
Socket screw wrench
.
Adjustable spanner
6
(14
17
19
24
and
27mm)
7
8
9
.
Spanne
*
*
*
.
Pipe cutter
.
Expander
.
Knife
10
11
12
13
14
.
Pliers
.
Leak tester and
soap solution
.
Steel tape
.
Scraper and file
.
Refrigeration
oil(polyol ester)
Code
Material
1-side adh-
esive tape
Connection
hose
Water-proof
insulation
material
Gesso
2-sided
adhesive
tape
A
B
C
D
E
Drainage
hose
F
Power supply requirements:
Cables for power supply, connection and signals are prepared by the owner.
Connection
duct dime-
nsions
Specifications
Liquid pipe
Gas pipe
AB092FCBHA
Copper tube option
AB142FCBHA
O 9.52(3/8")
O 6.35(1/4")
O12.7(1/2")
O 6.35(1/4")
2
3G(1.0-1.5)mm
H05RN-F
*
2X(0.75-1.5)
mm
2
*
Shielded wire
*
Electrical cables should be connected by ìYî method. Damaged or wornelectrical cable
must be replaced by authorized after sales agents.
A circuit breaker must be installed
The power plug should be connected as follows: L for live line, N for neutral line and
fo
r
grounding.
Dedicated electrical cable(30A)should be installed by a qualified technician in accordance
with the state regulation for electrical engineering.