Haier AB092FCBHA User Manual - Page 16
Preparation
View all Haier AB092FCBHA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 16 highlights
Introduction Preparation Tools for installation Following are necessary tools for installation: 1. Screw drivers (normal, 6. Spanne(14* 17* 19* Philips-head and tricorn) 24 and 27mm) 2. Hacksaw 3. 60mm drill 4. Socket screw wrench 7. Pipe cutter 8. Expander 9. Knife 5. Adjustable spanner Following materials are prepared by the owner: 10. Pliers 11. Leak tester and soap solution 12. Steel tape 13. Scraper and file 14.Refrigeration oil(polyol ester) Code A B C Material 1-side adhesive tape 2-sided adhesive tape Connection hose D Water-proof insulation material E Gesso F Drainage hose Power supply requirements: Voltage: single-phase1PH,220-230V**50Hz Dedicated electrical cable(30A)should be installed by a qualified technician in accordance with the state regulation for electrical engineering. The power source must be grounded. A circuit breaker must be installed Electrical cables should be connected by ìYî method. Damaged or wornelectrical cable must be replaced by authorized after sales agents. The power plug should be connected as follows: L for live line, N for neutral line and for grounding. Connection parameters: H05RN-F*3G(1.0-1.5)mm 2 Signal parameters: H05RN-F*2X(0.75-1.5) mm2 *Shielded wire* Cables for power supply, connection and signals are prepared by the owner. Specifications Connection duct dime- Liquid pipe nsions Gas pipe Copper tube option AB092FCBHA O 6.35(1/4") O 9.52(3/8") AB142FCBHA O 6.35(1/4") O12.7(1/2") AB182FCBHA O 9.52(1/4") O15.88(1/2") 15