Haier AB092FCBHA User Manual - Page 19
Installation of indoor unit
View all Haier AB092FCBHA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 19 highlights
Installation of indoor unit I. Location 1. Between the ceiling and the upstairs floor. 2. Favorable for water drainage pipes 3. Less than 2.7 meters above the floor for air outlet opening 4. Open for air circulation 5. Away from the area where heavy oily dusts, moisture or steam is likely to accumulate, such as kitchens and workshops 6. Free from sulfurous or irritant gas, including thinner and gasoline 7. Firm enough to hold the weight of the unit 8. Free from TV set, piano or other sensitive articles below 9. At least 1 meter away from TV set and radio H *0.31m II. Preparation for installation 1.5m Airflow Air intake Airflow outlet inlet outlet 1.5m Over2.5m (1) Location of ceiling opening and hanger rod (Front view) 460mm Hanger rod Thickness of the area where the ceiling overlaps decorative board should be over 15mm. Hanger rod pedestal Decorative board 630mm Ceiling 600mm Indoor unit set 575mm Space between each two hanger rods 620mm 335mm 210mm 35mm Space between each two hanger rods 620mm Ceiling Decorative board Indoor unit set 575mm Ceiling 600mm Decorative board 630mm (2)Cut an opening on the ceiling (if any) where the indoor unit is to be installed.Refer to the figure above for specific dimensions. Tubes for refrigerant and water drainage and electrical wires for remote controller, the fun unit and outdoor unit should be well fixed and arranged before installation of the indoor unit. Ceilings should be reinforced to prevent vibration after an opening is made. Consult an architect for necessary measures. 18