Haier XQB50-20 User Manual - Page 7

Install the water inlet hose

Page 7 highlights

Install the water inlet hose Confirm the water faucet Before Using Water faucet, suitable Water faucet, not suitable Outlet end surface >10mm It is required that the front end shall be longer than 10cm. The outlet end surface of the faucet shall be flat and smooth. If not please file it to avoid leakage. Connection between the water inlet hose jointer and the water faucet 1.Press the lower end of the lock lever and push down the slider. Take off the water inlet hose jointer from the water inlet hose component. See to Figure 1. 2.Loosen the screw till the water faucet can be accessed. Put the jointer of the water inlet hose on the faucet. See to Figure 2. (If the faucet is too large and the jointer can not be set on the water faucet, please loosen the four screws and take out the bushing in the jointer. See to the figure.) Water inlet pipe jointer Slider Screw Locking lever Screwdriver Mark label Water inlet pipe Figure 1 Figure 2 3.Fasten the four screws evenly. See to Figure 4. 4.Take off the nameplate. Twist the fastening nut as per the indication of the figure to seal up the outlet end surface of the faucet. See to Figure 5. Remarks: Before installation, the threading is 4mm above the upper surface of the nut. After installation, the threading is 2mm above the upper surface of the nut. See to Figure 6. Liner Figure 3 Figure 4 Nut Figure 5 About 4mm before twisting About below 2mm after twisting Figure 6 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20

Water faucet, suitable
Water faucet, not suitable
It is required that the front end shall be longer than 10cm.
The outlet end surface of the faucet shall be flat and smooth. If not please file it
to avoid leakage.
2.
Loosen the screw till the water faucet can be accessed. Put the jointer of the water
inlet hose on the faucet. See to Figure 2. (If the faucet is too large and the jointer can
not be set on the water faucet, please loosen the four screws and take out the
bushing in the jointer. See to the figure.)
1.
Press the lower end of the lock lever and push down the slider. Take off the water inlet
hose jointer from the water inlet hose component. See to Figure 1.
Remarks: Before installation, the threading is 4mm above the upper surface of
the nut. After installation, the threading is 2mm above the upper surface of the
nut. See to Figure 6.
4.Take off the nameplate. Twist the fastening nut as per the indication of the figure to
seal up the outlet end surface of the faucet. See to Figure 5.
3.Fasten the four screws evenly. See to Figure 4.
>10mm
Outlet end surface
Nut
About 4mm before twisting
About below 2mm after twisting
Screw
Screwdriver
Mark label
Liner
Figure 2
Figure 5
Figure 1
Figure 4
Figure 3
Figure 6
Slider
Water inlet pipe jointer
Water inlet pipe
Locking lever
Before Using
Before Using
Install the water inlet hose
Confirm the water faucet
Connection between the water inlet hose jointer and
the water faucet
5