HP 3PAR StoreServ 7450 2-node HP 3PAR StoreServ 7450 Storage Installation Guid - Page 37
Verifying Setup and Powering On the Storage System, Verifying Setup, Verifying Power Connections
View all HP 3PAR StoreServ 7450 2-node manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 37 highlights
6 Verifying Setup and Powering On the Storage System This section describes the verification of procedures for setting up and powering on all components in the storage system. NOTE: To avoid any cabling errors, all drive enclosures must have at least one or more hard drives installed before powering on the enclosure. Verifying Setup To complete the installation, you must verify the power connection and final positioning and then power on the storage system. Verifying Power Connections Verify the following before powering on the storage system: • Redundant Power • Power cord connections • AC cord connections • Main power cords NOTE: Secure the power cord with the retainer by placing the wire into the circular loop and cinching it closed. You can slide the retainer by lifting the small tab behind the circular loop. Redundant Power The racks use redundant PDUs and power supplies to provide power redundancy throughout the system. Before powering on the storage system, verify that the system has a valid redundant power configuration connected to independent electrical power providers. Each of the PDUs must connect to a power socket with power being separately supplied by an independent electrical power source. CAUTION: Ensure the storage system does not exceed the ratings of the power sources and PDUs, and adheres to the guidelines described in HP 3PAR StoreServ 7450 Storage Site Planning Manual. Power Cord Connections Each storage system arrives with all internal power cords configured and connected. Before powering on the storage system, verify the following: • The AC cords are correctly configured and properly connected to the component • The AC cord locks and cable ties on the PDUs and PCMs are properly connected • If you have a physical SP, verify it is properly connected to the PDU Repositioning the Storage System Install the rear door of the storage system and filler panels that may not have been completed during installation. If you have not positioned the storage system in a permanent operating location, as described in "Positioning the Cabinet" (page 15), place the storage system in its final position before powering on. Verifying Setup 37