HP Cisco MDS 9140 Cisco MDS 9500 Series Hardware Installation Guide (OL-17467- - Page 174

system switchover, A-2, Installing a Fabric Module

Page 174 highlights

Migration Procedures for the MDS 9513 Director Appendix A Migrating to Generation 3 8-Gbps Fibre Channel Switching Modules Send documentation comments to [email protected]. Figure A-2 Installing a Fabric Module 147940 c. Grasp the two ejector levers using the thumb and forefinger of each hand, and press down to create a small 0.040-inch (1-mm) gap between the module's EMI gasket and the module above it. Caution Do not press down too forcefully on the levers because they can bend. d. While pressing down, simultaneously close the top and bottom ejector levers to completely seat the module in the midplane connector. The ejector levers are completely closed when they are flush with the front of the module. Note Ensure that the ejector levers are completely closed before tightening the captive screws. Failure to completely seat the module in the backplane connector can result in error messages. Step 12 Step 13 e. Tighten the two captive screws on the module until they are finger tight. Verify that the LED light on the front of the module is green. The light should come on within five seconds of the module being inserted. If it does not, check to see if the module is seated correctly in the slot. Enter the system switchover command to put the other supervisor in active mode. Cisco MDS 9500 Series Hardware Installation Guide A-8 OL-17467-02

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288

Send documentation comments to [email protected].
A-8
Cisco MDS 9500 Series Hardware Installation Guide
OL-17467-02
Appendix A
Migrating to Generation 3 8-Gbps Fibre Channel Switching Modules
Migration Procedures for the MDS 9513 Director
Figure A-2
Installing a Fabric Module
c.
Grasp the two ejector levers using the thumb and forefinger of each hand, and press down to create
a small 0.040-inch (1-mm) gap between the module's EMI gasket and the module above it.
Caution
Do not press down too forcefully on the levers because they can bend.
d.
While pressing down, simultaneously close the top and bottom ejector levers to completely seat the
module in the midplane connector. The ejector levers are completely closed when they are flush with
the front of the module.
Note
Ensure that the ejector levers are completely closed before tightening the captive screws. Failure
to completely seat the module in the backplane connector can result in error messages.
e.
Tighten the two captive screws on the module until they are finger tight.
Step 12
Verify that the LED light on the front of the module is green. The light should come on within five
seconds of the module being inserted. If it does not, check to see if the module is seated correctly in the
slot.
Step 13
Enter the
system switchover
command to put the other supervisor in active mode.
147940