HP Integrity Superdome 2 HP Integrity Superdome 2 Site Preparation Guide (AH33 - Page 37
Sample Site Inspection Checklist for Site Preparation, Generic Site Preparation, Guide - integrity superdome 2 cms
View all HP Integrity Superdome 2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 37 highlights
IMPORTANT: HP recommends that people in the immediate vicinity of the product for extended periods of time wear hearing protection or use other means to reduce noise exposure. This level of noise is appropriate for dedicated computer room environments, not office environments. You must understand the acoustic noise specifications relative to operator positions within the computer room when adding HP Integrity Superdome 2 systems to computer rooms with existing noise sources. For more information about general site preparation guidelines, see the Generic Site Preparation Guide. Sample Site Inspection Checklist for Site Preparation See Table 2-13 and Table 2-14 (page 37). They may be used to measure your progress. Table 2-13 Customer and HP Information Customer Information Name: Street address: State or province: Zip or postal code: Primary customer contact: Secondary customer contact: Traffic coordinator: Sales representative Representative making survey Scheduled delivery date Phone number: City or Town: Country Phone number: Phone number: Phone number: HP information Order number: Date: Table 2-14 Site Inspection Checklist Check either Yes or No. If No, include comment number or date. Computer Room Number Area or condition Yes No 1. Is there a completed floor plan? 2. Is adequate space available for maintenance needs? Front 36 inches (91.4 cm) minimum and rear 36 inches (91.4 cm) minimum are recommended clearances. 3. Is access to the site or computer room restricted? 4. Is the computer room structurally complete? Expected date of completion? 5. Is a raised floor installed and in good condition? What is the floor to ceiling height? [7.5 ft (228 cm) minimum] 6. Is the raised floor adequate for equipment loading? 7. Are channels or cutouts available for cable routing? 8. Is a network line available? Comment or Date Sample Site Inspection Checklist for Site Preparation 37