2 Site preparation Site preparation Planning for printer installation This chapter covers the main topics related to efficient planning and preparation of the site. Take into consideration any structural modifications required and the time required for submission and approval of plans to the relevant local authorities. Secure temporary storage for the shipping crate prior to equipment installation may also be necessary. CAUTION: All cables connected to the printer should be contained within suitable conduits; these may be overhead or channeled into the floor, as appropriate. Tripping over loose wires or cables can cause personal injury and/or damage to the equipment. Installation time schedule The best method to ensure a smooth and trouble-free installation process is proper site preparation. The following time schedule estimate is based on the assumption that all system components have been delivered in proper working order and all site preparation and planning requirements have been met and completed, in accordance with the specifications provided in this guide. The installation process is divided into two phases: Table 2-1 Installation time schedule Time to completion (LX820) Time to completion (LX850) Installation and System Configuration Operation and Maintenance Training 1 full working day 2 full working days 1.5 full working days 2.5 full working days Although the optimal time schedule requires approximately 3 or 4 full working days, it may be necessary to schedule additional time for Installation and System Configuration or Operation and Maintenance Training. Please plan ahead for any special circumstances that may occur during the installation process, and do not plan for production during installation and training. If the RIP software is bought from HP, the training will cover the normal use of the RIP. The following aspects of RIP usage will be covered: HP Scitex Onyx RIP ● Queue manager ● Configure Printer (Quickset, Device Output, Media, Page size, Properties) ● Main items of the Preflight (Printer and Media Selection, Preview and Size, Tiling Setup, Color Correction, Print) ENWW Planning for printer installation 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

2
Site preparation
Planning for printer installation
This chapter covers the main topics related to efficient planning and preparation of the site. Take into
consideration any structural modifications required and the time required for submission and approval
of plans to the relevant local authorities. Secure temporary storage for the shipping crate prior to
equipment installation may also be necessary.
CAUTION:
All cables connected to the printer should be contained within suitable conduits; these
may be overhead or channeled into the floor, as appropriate. Tripping over loose wires or cables can
cause personal injury and/or damage to the equipment.
Installation time schedule
The best method to ensure a smooth and trouble-free installation process is proper site preparation. The
following time schedule estimate is based on the assumption that all system components have been
delivered in proper working order and all site preparation and planning requirements have been met
and completed, in accordance with the specifications provided in this guide. The installation process is
divided into two phases:
Table 2-1
Installation time schedule
Time to completion (LX820)
Time to completion (LX850)
Installation and System Configuration
1 full working day
1.5 full working days
Operation and Maintenance Training
2 full working days
2.5 full working days
Although the optimal time schedule requires approximately 3 or 4 full working days, it may be
necessary to schedule additional time for Installation and System Configuration or Operation and
Maintenance Training. Please plan ahead for any special circumstances that may occur during the
installation process, and do not plan for production during installation and training.
If the RIP software is bought from HP, the training will cover the normal use of the RIP. The following
aspects of RIP usage will be covered:
HP Scitex Onyx RIP
Queue manager
Configure Printer (Quickset, Device Output, Media, Page size, Properties)
Main items of the Preflight (Printer and Media Selection, Preview and Size, Tiling Setup, Color
Correction, Print)
ENWW
Planning for printer installation
5
Site preparation