HP StorageWorks 16-EL HP StorageWorks SAN Switch Rack Mount Kit Installation I - Page 6
Power Requirements, Rack Mount Checklist
View all HP StorageWorks 16-EL manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 6 highlights
Follow these guidelines to ensure proper air flow, and prevent component overheating: ■ To ensure adequate cooling, install the switch with the non-port side, which contains the air intake vents, facing the cool-air aisle. ■ Verify a minimum of 47 cubic feet/minute (79.8 cubic meters/hour) of air flow is available to the air intake vents on the non-port side of the switch. ■ Verify that the ambient air temperature does not exceed 40° Celsius (104° Fahrenheit) while the switch is operating. Caution: Do not block air vents. The switch uses ambient air for cooling. Power Requirements The AC power source must meet these requirements: ■ Primary AC Input 100-240 VAC (switch auto-senses input voltage) 47-63 Hz ■ Correctly wired primary outlet, with circuit protected by a circuit breaker and grounded in accordance with local electrical codes ■ Adequate supply circuit, line fusing, and wire size, as specified by the electrical rating on the switch nameplate ■ Voltage capability of 85-264 VAC ■ Input voltage frequency of 47-63 Hz ■ Power capability of 75 W maximum Rack Mount Checklist Verify that the rack and the area around the rack meets the following requirements: ■ The cabinet must be a standard EIA cabinet. ■ Plan a cabinet space that is 1.5 rack units high (2.6 inches; 6.7 cm), 19 inches (48.3 cm) wide, and at least 23 inches (68.6 cm) deep. ■ Ground all equipment in the cabinet through a reliable branch circuit connection, and maintain ground at all times. Do not rely on a secondary connection to a branch circuit, such as a power strip. 6 SAN Switch Rack Mount Kit Installation Instructions