LG DLHC1455V Owners Manual - Page 21
Special Electrical, Requirements, Final Installation Check
View all LG DLHC1455V manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 21 highlights
Special Electrical Requirements For Mobile or Manufactured Homes • Any installation in a manufactured or mobile home must comply with the Manufactured Home Construction and Safety Standards Title 24 CFR, Part 3280 or Standard CAN/ CSA Z240 MH and local codes and ordinances. If you are uncertain whether your proposed installation will comply with these standards, please contact a service and installation professional for assistance. • A 4-wire connection is required for all mobile and manufactured home installations, as well as all new construction after January 1, 1996. • The electrical connection for an electric dryer must be a 4-wire connection. More detailed information concerning the electrical connection is provided in the section Connecting Electric Dryers. • To reduce the risk of combustion and fire, the dryer must be vented to the outside. • DO NOT vent the dryer under a manufactured home or mobile home. • Electric dryers may be vented to the outside using the back, left, right, or bottom panel. • Make sure the dryer has adequate access to outside fresh air to ensure proper operation. The opening for outside fresh air must be at least 25 sq. in (163 cm2). • Please be aware that venting materials are not supplied with the dryer. You must obtain the venting materials necessary for proper installation. Final Installation Check Once you have completed the installation of the dryer and it is in its final location, confirm proper operation with the following tests. Checking Levelness Once the dryer is in its final location, recheck the dryer to be sure it is level. Make sure it is level front to back and side to side, and that all four leveling feet are in firm contact with the floor. INSTALLATION 21 ENGLISH