LG HBLG2350E Service Manual - Page 14
Suggested Tool Requirements
View all LG HBLG2350E manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
3.5 SUGGESTED TOOL REQUIREMENTS SCREWDRIVER(+, -), RULER, KNIFE, HAMMER, PENCIL, LEVEL 3.5.1 PREPARATION OF CHASSIS 1. Remove the screws which fasten the cabinet at both sides and at the back. Keep these two screws which fasten the cabinet at both sides for later use. Shipping screws 2. Slide the unit out from the cabinet by gripping the base pan handle and pulling forward while bracing the cabinet. 3. Cut the window sash seal to the proper length. Peel off the backing and attach the Foam-PE to the underside of the window sash. 4. Remove the backing from Foam-PE with 3 holes and attach it to the bottom of the Top retainer bar. Figure 18 5. Attach the Top retainer bar onto the top of the cabinet with 3 screws (Type A). 6. Insert the Frame guides into the bottom of the cabinet. Figure 19 7. Insert the Frame Curtain into the Top retainer bar and Frame guides. 8. Fasten the curtains to the unit with 10 screws (Type A) at both sides. Foam-PE Figure 20 Top retainer bar Top retainer bar Foam-PE Copyright ©2007 LG Electronics. Inc. All right reserved. Only for training and service purposes Screw (Type A) Figure 21 Frame guide Screw(Type A) - 14 - LGE Internal Use Only