NordicTrack Grt950 English Manual - Page 8
Cable Assembly
View all NordicTrack Grt950 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 8 highlights
8. Attach the Hack Squat Frame (5) to the Hack 8 Squat Bracket (3) with a 25mm x 86mm Pivot Rod (15), two M10 Large Washers (30), and two M10 x 25mm Bolts (31). Squeeze the Release Handle (10) and align the Hack Squat Pin (12) with a hole in the arm on the Hack Squat Bracket (3). Let go of the Release Handle so that the Hack Squat Pin engages the hole. Cable Assembly 9 9. Locate the Hack Squat Cable (20). Attach the Cable and a Pulley (19) to the Hack Squat Bracket (3) with an M10 x 60mm Bolt (24), four M10 Washers (36), and an M10 Locknut (32). 5 12 10 31 Arm 30 3 31 15 30 32 3 19 24 36 36 20 10. Wrap the Hack Squat Cable (20) around a Pulley 10 (19). Attach the Pulley, along with another Pulley, inside the bracket on the Hack Squat Base (1) with an M10 x 70mm Bolt (40) and an M10 Locknut (32). 11. Route the Hack Squat Cable (20) over the 11 Pulley (19) attached to the Hack Squat Bracket (3) in step 9. Make sure that the Cable is routed over the Pulley from the back to the front. 20 1 19 32 40 Bracket 3 19 20 8