Panasonic 26PSU1U6 Tech Data - Service Manual - Page 105

Make sure whether the ground construction is, Make sure whether there is miswiring or incorrect

Page 105 highlights

SUPPLEMENT ON DRAIN PIPING 1. Specifications Checkpoint after installation After installation of indoor and outdoor units, panels and electrical wiring, check the following items. Checkpoint Symptom Check Remark 1 Make sure whether indoor and outdoor units are correctly installed. Fall, vibration, noise 2 Make sure whether gas leakage is tested. No cooling, no heating 3 Make sure whether insulation is completed. (Refrigerant piping and drain piping) Water leakage 4 Make sure whether drain water is running smoothly. Water leakage 5 Make sure whether the power voltage matches the nameplate. Inoperative, burnout 6 Make sure whether there is miswiring or incorrect connection. Inoperative, burnout 7 Make sure whether the ground construction is completed. Ground leakage 1 8 Make sure whether the wire gauge is followed by the recommended specifications. Inoperative, burnout 9 Make sure whether the air intake and air outlet of the indoor and outdoor units are sealed by obstacles. No cooling, no heating 1-99

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198

1-99
1. Specifications
SUPPLEMENT ON DRAIN PIPING
Checkpoint after installation
After installation of indoor and outdoor units, panels and electrical wiring, check the following items.
k
r
a
m
e
R
k
c
e
h
C
m
o
t
p
m
y
S
t
n
i
o
p
k
c
e
h
C
1
Make sure whether indoor and outdoor units are
correctly installed.
Fall, vibration, noise
2
Make sure whether gas leakage is tested.
No cooling, no heating
3
Make sure whether insulation is completed.
(Refrigerant piping and drain piping)
Water leakage
4
Make sure whether drain water is running smoothly.
Water leakage
5
Make sure whether the power voltage matches the
nameplate.
Inoperative, burnout
6
Make sure whether there is miswiring or incorrect
connection.
Inoperative, burnout
7
Make sure whether the ground construction is
completed.
Ground leakage
8
Make sure whether the wire gauge is followed by the
recommended specifications.
Inoperative, burnout
9
Make sure whether the air intake and air outlet of the
indoor and outdoor units are sealed by obstacles.
No cooling, no heating
1