ProForm 8.0 Zt Treadmill English Manual - Page 9

second Bolt Spacer 90, M10 x 68mm Patch

Page 9 highlights

6. With the help of a second person, carefully tip the treadmill onto its right side. Partially fold the Frame (56) so that the treadmill is more stable; do not fully fold the Frame yet. Remove the M10 x 50mm Bolt (31), the M10 Nut (19), and the shipping bracket (A) from the Base (95). Attach a Wheel (97) with the Bolt and the Nut that you just removed. Do not overtighten the Nut; the Wheel must turn freely. Discard the shipping bracket. Press a Base Cap (87) into the Base (95). 6 87 31 56 95 97 A 19 7. With the help of a second person, hold a Bolt Spacer (90) inside the lower end of the Left Upright (85). Insert an M10 x 95mm Patch Bolt (8) with an M10 Star Washer (9) into the Left Upright and the Bolt Spacer. Repeat this step with a second Bolt Spacer (90), M10 x 68mm Patch Bolt (114), and M10 Star Washer (9). Hold the Left Upright Spacer (86) and the Left Upright (85) against the Base (95). Tighten the M10 x 95mm Patch Bolt (8) and the M10 x 68mm Patch Bolt (114) until the heads of the Patch Bolts touch the Left Upright; do not fully tighten the Patch Bolts yet. With the help of a second person, tip the treadmill so that the Base (95) is flat on the floor. 7 90 114 9 86 95 8 85 8. Identify the Left and Right Upright Covers (109, 110). Slide the Left Upright Cover onto the Left 8 Upright (85) as shown. Slide the Right Upright Cover onto the Right Upright (89) as shown. 109 85 89 110 9

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

9
6.
With the help of a second person, carefully tip
the treadmill onto its right side. Partially fold the
Frame (56) so that the treadmill is more stable;
do not fully fold the Frame yet.
Remove the M10 x 50mm Bolt (31), the M10
Nut (19), and the shipping bracket (A) from the
Base (95). Attach a Wheel (97) with the Bolt and
the Nut that you just removed.
Do not over-
tighten the Nut; the Wheel must turn freely.
Discard the shipping bracket.
Press a Base Cap (87) into the Base (95).
6
95
97
31
56
19
A
87
7.
With the help of a second person, hold a Bolt
Spacer (90) inside the lower end of the Left
Upright (85). Insert an M10 x 95mm Patch Bolt (8)
with an M10 Star Washer (9) into the Left Upright
and the Bolt Spacer.
Repeat this step with a
second Bolt Spacer (90), M10 x 68mm Patch
Bolt (114), and M10 Star Washer (9).
Hold the Left Upright Spacer (86) and the Left
Upright (85) against the Base (95). Tighten the
M10 x 95mm Patch Bolt (8) and the M10 x 68mm
Patch Bolt (114) until the heads of the Patch Bolts
touch the Left Upright;
do not fully tighten the
Patch Bolts yet.
With the help of a second person, tip the treadmill
so that the Base (95) is flat on the floor.
86
85
114
8
95
90
9
7
8.
Identify the Left and Right Upright Covers (109,
110). Slide the Left Upright Cover onto the Left
Upright (85) as shown. Slide the Right Upright
Cover onto the Right Upright (89) as shown.
109
8
85
89
110