Samsung NX58K3310SS/AA Installation Guide - Page 15

English 15, Exception

Page 15 highlights

Minimum dimensions WARNING If overhead cabinets are provided, a range hood should also be provided that projects horizontally a minimum of 5 in (12.7 cm) beyond the front of the cabinets. This will dissipate any heat buildup in the overhead cabinets to prevent death, personal injury, and/or fire hazard. The ventilating hood must be constructed of sheet metal not less then 0.0122" thick. Install above the cooktop with a clearance of not less than 1/4" between the hood and the underside of the combustible material or metal cabinet. The hood must be at least as wide as the appliance and centered over the appliance. Clearance between the cooking surface and the ventilation hood surface must never be less than 24 inches. Exception : Installation of a listed microwave oven or cooking appliance over the cooktop shall conform to the installations packed with that appliance. • 30-in (76.2-cm) minimum clearance between the top of the cooking surface and the bottom of an unprotected wood or metal cabinet; or If no 30-in (76.2cm) minimum clearance, 24-in (61-cm) minimum when the bottom of the wood or metal cabinet is protected by not less than 0.25-in (0.64-cm) flame-retardant millboard covered with not less than no. 28 MSG sheet steel, 0.015-in (0.038cm) stainless steel, 0.024-in (0.061-cm) aluminum, or 0.020-in (0.051-cm) copper. • 18-in (45.7-cm) minimum between the countertop and the adjacent cabinet bottom. Recommended locations for gas piping and electrical outlets 17 in x 9 in (43.2 cm x 22.9 cm) Gas Wall Area Recommended area for through-the-wall and through-the-floor connection of gas pipe stub and shut-off valve. Recommended position 12 in (30.5 cm) Recommended area for 120 V electrical outlet on rear wall 17(4Gi3na.2sxFc2mloion3xr0C5Aai.brn1ein(ac7me6t).O2pcemn)ing Installation requirements English 15

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84

English 15
Installation requirements
Minimum dimensions
WARNING
If overhead cabinets are provided, a range hood should also be provided that
projects horizontally a minimum of 5 in (12.7 cm) beyond the front of the cabinets.
This will dissipate any heat buildup in the overhead cabinets to prevent death,
personal injury, and/or fire hazard. The ventilating hood must be constructed of
sheet metal not less then 0.0122" thick. Install above the cooktop with a clearance
of not less than 1/4" between the hood and the underside of the combustible
material or metal cabinet. The hood must be at least as wide as the appliance
and centered over the appliance. Clearance between the cooking surface and the
ventilation hood surface must never be less than 24 inches.
Exception :
Installation of a listed microwave oven or cooking appliance over the
cooktop shall conform to the installations packed with that appliance.
30-in (76.2-cm) minimum clearance between the top of the cooking surface
and the bottom of an unprotected wood or metal cabinet; or If no 30-in (76.2-
cm) minimum clearance, 24-in (61-cm) minimum when the bottom of the wood
or metal cabinet is protected by not less than 0.25-in (0.64-cm) flame-retardant
millboard covered with not less than no. 28 MSG sheet steel, 0.015-in (0.038-
cm) stainless steel, 0.024-in (0.061-cm) aluminum, or 0.020-in (0.051-cm)
copper.
18-in (45.7-cm) minimum between the countertop and the adjacent cabinet
bottom.
Recommended locations for gas piping and electrical outlets
Recommended area
for 120 V electrical
outlet on rear wall
Recommended
position
30 in (76.2 cm)
Cabinet Opening
12 in
(30.5 cm)
17 in x 9 in
(43.2 cm x 22.9 cm)
Gas Wall Area
Recommended area
for through-the-wall
and through-the-floor
connection of gas pipe
stub and shut-off valve.
17 in x 2 in
(43.2 cm x 5.1 cm)
Gas Floor Area