Weider 3130 English Manual - Page 15

Cable Assembly

Page 15 highlights

Cable Assembly 19 19. See the CABLE DIAGRAMS on page 28 to identify the cables as you assemble them. Identify the Butterfly Cable (50). Grease an M8 x 22mm Shoulder Bolt (90). Attach the Cable to the Left Butterfly Bracket (28) with the Shoulder Bolt and an M8 Nylon Locknut (78). Make sure the flat edge of the Cable is against the Butterfly Arm. Do not overtighten the Shoulder Bolt; the Cable must be able to pivot freely. 90 Grease 50 28 78 20. Wrap the Butterfly Cable (50) over a "V"-pulley (47). Attach the "V"-pulley, a Long Cable Trap (57), an M10 Washer (80), and two Guards (54) to the Upright (2) with an M10 x 60mm Bolt (79) and an M10 Nylon Locknut (77). Flat Edge 20 2 77 54 50 57 54 79 80 47 21. Wrap the Butterfly Cable (50) under a 90mm 21 Pulley (48). Attach the Pulley and two Half Guards (55) to the Double "U"-bracket (61) with an M10 x 45mm Bolt (86) and an M10 Nylon Locknut (77). Make sure the Half Guards are oriented as shown. 48 86 55 50 77 55 61 15

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36

15
19.
See the CABLE DIAGRAMS on page 28 to identi-
fy the cables as you assemble them.
Identify the Butterfly Cable (50).
Grease an
M8 x 22mm Shoulder Bolt (90). Attach the Cable to
the Left Butterfly Bracket (28) with the Shoulder Bolt
and an M8 Nylon Locknut (78).
Make sure the flat
edge of the Cable is against the Butterfly Arm.
Do not overtighten the Shoulder Bolt; the Cable
must be able to pivot freely.
20. Wrap the Butterfly Cable (50) over a “V”-pulley
(47). Attach the “V”-pulley, a Long Cable Trap
(57), an M10 Washer (80), and two Guards (54)
to the Upright (2) with an M10 x 60mm Bolt (79)
and an M10 Nylon Locknut (77).
21. Wrap the Butterfly Cable (50) under a 90mm
Pulley (48). Attach the Pulley and two Half
Guards (55) to the Double “U”-bracket (61) with
an M10 x 45mm Bolt (86) and an M10 Nylon
Locknut (77).
Make sure the Half Guards are
oriented as shown.
19
20
54
50
47
2
80
54
57
79
77
50
78
90
Grease
28
21
48
50
77
55
55
61
86
Cable Assembly
Flat Edge